Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 3861 to 3880 of 5974

3861
Scheduling of step-improving jobs with an identical improving rate

Kim, Hyunjung; Kim, Eun-Seok; Lee, Jun-Ho, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.73, no.5, pp.1127 - 1136, 2022-05

3862
Scheduling of the photolithography process for semiconductor manufacturing = 반도체 포토공정의 일정계획link

Kim, Young-Hwan; 김영환; et al, 한국과학기술원, 1996

3863
Scheduling of the stepper workstation for memory chips fabrication = 메모리칩 제조를 위한 스테퍼 장비의 일정계획link

Kim, Jin-Kuk; 김진국; et al, 한국과학기술원, 1997

3864
Scheduling of Three-Operation Jobs in a Two-Machine Flow Shop with Mean Flow Time Measure

성창섭, 한국경영과학회, 2006

3865
Scheduling of three-operation jobs in a two-machine flowshop with mean flowtime measure = 두 대의 기계에서 세 가지씩의 공정을 수행하는 작업의 평균 플로우 시간을 최소화하는 스케쥴링 문제link

Ha, Hee-Jin; 하희진; et al, 한국과학기술원, 2007

3866
Scheduling of Value-Recoverable Jobs for Maximizing Total Job Value over a Planning Horizon = Job의 가치 회복 최적화를 위한 일정계획 연구link

Kim, Sung-Hoon; 김성훈; et al, 한국과학기술원, 2009

3867
Scheduling on parallel identical machines to minimize total tardiness

Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02

3868
Scheduling pressing processes of battery manufacturing with a genetic algorithm

Park, Sang-Su; Lee, Sangwook; Kim, Hyunjung, IEEE International Conference on Automation Science and Engineering, IEEE Robotics and Automation Society, 2020-08-21

3869
Scheduling problem for persistent automated robotic service = 지속적인 자동 로봇 서비스를 위한 스케쥴링 문제link

Song, Byung Duk; 송병덕; et al, 한국과학기술원, 2015

3870
Scheduling problem in a two-machine flow line with the N- step prio-fob-dependent set-up times

Hwang, Hark, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.32, no.3, pp.375 - 385, 2001-01

3871
Scheduling problems related with due date measures in parallel-machine shops = 병렬 기계 공정에서의 납기를 고려한 일정계획에 관한 연구link

Shim, Sang-Oh; 심상오; et al, 한국과학기술원, 2006

3872
Scheduling problems with due date-related measures for hybrid flowshops = 혼합 흐름 공정에서의 납기를 고려한 일정계획에 관한 연구link

Lee, Geun-Cheol; 이근철; et al, 한국과학기술원, 2003

3873
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

3874
Scheduling single-armed cluster tools with reentrant wafer flows

Lee, HY; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.19, no.2, pp.226 - 240, 2006-05

3875
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation

Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012

3876
Scheduling target surveillance and reconnaissance tasks for diverse ISR assets of a tactical echelon = 전술제대 다종 정보감시자산 표적 감시 스케줄링link

Park, Sangho; Lee, Tae Eog; et al, 한국과학기술원, 2020

3877
Scheduling Time-Constrained Cyclic Manufacturing Systems: Linear Programming and Directed Graph Models

Lee, Tae-Eog; Shin, Yong-Ho, APIEMS, pp.1 - 5, 2002-12

3878
Scheduling timed Petri nets with a time-feasible reachability tree

Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE Conference on Networking, Sensing, and Control, pp.94 - 99, IEEE Systems, Man, and Cybernetics Society, 2013-04-10

3879
Scheduling transient period of cluster tools to reach a steady schedule = 반도체 제조용 클러스터 장비에서 안정상태 도달을 위한 전이기간 스케줄링link

Kim, Woojin; Lee, Tae-Eog; et al, 한국과학기술원, 2018

3880
Scheduling transient periods of dual-armed cluster tools

Lee, Tae-Eog; Lee, Jun-Ho; Kim, Hyun-Jung, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08

rss_1.0 rss_2.0 atom_1.0