Scheduling problem in a two-machine flow line with the N- step prio-fob-dependent set-up times

Cited 11 time in webofscience Cited 0 time in scopus
  • Hit : 332
  • Download : 0
The purpose of this study is to develop effective scheduling methodologies for the shop scheduling problem of a flow line. The flow line consists of two machines where only the second machine has separable, external,and sequence-dependent set-up times. The length of set-up times required for a job depends not on the immediately preceding job but on the job which is n steps prior to it. The problem is solved by a dynamic programming with the objective of minimizing the make span. An optimal schedule is found utilizing the sequence dominance condition. Since the computational requirements of the dynamic programming are impracticable demanding for large-sized problems, a genetic algorithm is developed and its performance is examined through a comparative study.
Publisher
Taylor & Francis Ltd
Issue Date
2001-01
Language
English
Article Type
Article
Keywords

GENETIC ALGORITHMS; SEQUENCE; DATES

Citation

INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.32, no.3, pp.375 - 385

ISSN
0020-7721
URI
http://hdl.handle.net/10203/79276
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 11 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0