Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Author Sung, Chang Sup

Showing results 53 to 105 of 105

53
Effective Paging Procedure for the Optical Feeder Microcellular System

Sung, Chang Sup; Rim, Hyoun Chul; Lee, Jung Sup, IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, v.52, no.4, pp.837 - 846, 2003-07

54
Ergodic Behavior of Nonstationary Finite Continuous - Time Markov Processes

Sung, Chang Sup, pp.25 - 31, 1983-04-01

55
Fixed pre-assembly scheduling on multiple fabrication machines

Yoon, Sang Hum; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.96, no.1, pp.109 - 118, 2005-04

56
Heurisic Algorithm for Minimizing Earliness-Tardiness on a Single Burn-in Oven in Semiconductor Manufacturing. Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing

Sung, Chang Sup, International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp.217 - 222, 2002

57
Heuristic Algorithm for Minimizing Earliness-Tardiness on a Single Burn-In Oven in Semiconductor Manufacturing

Sung, Chang Sup, International Conference on Modeling and Analysis of Semiconductor Manufacturing (2002), pp.1 - 6, 2002

58
Heuristic Algorithms for a Single-Machine Common Due Date Assignment under Earliness/Tardiness Measure

Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.36, no.3, pp.121 - 133, 1993-04

59
Integrated service network design for a cross-docking supply chain network

Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.54, no.12, pp.1283 - 1295, 2003-12

60
Inventory Control in an (1:1:N) SCM Model with Remanufacturing and Disposal Allowed

Sung, Chang Sup, Asia Pacific Management Conference, 2004

61
Inventory-Distribution Planning in A Supply Chain System with Heterogeneous Vehicles

Sung, Chang Sup, Multi-Echelon/MSOM 2004, 2004

62
Joint configuration of backbone and logical networks on a reconfigurable packet-switched network with unreliable links

Lee, JH; Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.30, no.3, pp.309 - 331, 1998-04

63
Locating a distance-dependent facility on an undirected network with continuous link weights

Sung, Chang Sup; cheol min joo, ENGINEERING OPTIMIZATION, v.27, no.4, pp.341 - 366, 1997

64
LOCATING AN OBNOXIOUS FACILITY ON A EUCLIDEAN NETWORK TO MINIMIZE NEIGHBORHOOD DAMAGE

Sung, Chang Sup; cheol min joo, NETWORKS, v.24, no.1, pp.1 - 9, 1994

65
Locating an obnoxious Facility on a Network with Decreasing Euclidean Metric

Sung, Chang Sup, pp.0 - 0, 1994-04-01

66
Locating Base Stations in a DCS-Incorporated Mobile Radio Network

Sung, Chang Sup, pp.0 - 0, 1995-01-01

67
Location Management in an Optical Feeder Micro Cellular System

Sung, Chang Sup, INFORMS/KORMRS Seoul 2000 Conference, 2000

68
Lot Streaming in a Multi-Stage Flow Shop with Batch Setup Times

Sung, Chang Sup, pp.0 - 0, 1993-04-01

69
Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint

Sung, Chang Sup; Juhn, Jaeho, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.119, no.2, pp.392 - 401, 2009-03

70
Maximizing total job value on a single machine with job selection

Eun, Joonyup; Sung, Chang Sup; Kim, Eun-Seok, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.68, no.9, pp.998 - 1005, 2017-09

71
Mimixizing Makespan on a Single Burn-In Oven with Job Families and Dynamic Job Arrivals Allowed

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.29, no.8, pp.995 - 1007, 2002-07

72
Minimax Approach for Logical Configuration in Reconfigurable Virtual Circuit Data Network

Sung, Chang Sup; park, s.k., IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, v.E78A, no.8, pp.1029 - 1033, 1995-08

73
Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed

Lee, Ik Sun; Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.186, no.3, pp.931 - 952, 2008-05

74
Minimizing Due Date Related Peformance Measures on Two Batch Processing Machines

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.147, no.3, pp.644 - 656, 2003-06

75
Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed

Sung, Chang Sup; Kim, YH, COMPUTERS AND OPERATIONS RESEARCH, v.29, no.3, pp.275 - 294, 2002-02

76
Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.120, no.3, pp.559 - 574, 2000-02

77
Minimizing Makespan on a Single Burn-In Oven wih Job Families and Dynamic Job Arrivals Allowed

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.120, no.3, pp.559 - 574, 2000-10

78
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed

Sung, Chang Sup; Yoon, SH, ENGINEERING OPTIMIZATION, v.28, no.3, pp.231 - 243, 1997-04

79
Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Tow Feeding Machines

Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.54, no.3, pp.247 - 255, 1998-04

80
Non-Stationary Inventory Position Processes

Sung, Chang Sup, STOCHASTIC PROCESSES AND THEIR APPLICATIONS, v.15, no.0, pp.83 - 91, 1983-04

81
Optimal Age-Replacement Policy fo Equipment Monitored by a Stochastically Failing Indicator

Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.34, no.2, pp.162 - 164, 1985-06

82
OPTIMAL BUFFER SPACE FOR A PERIODIC REVIEW PRODUCTION INVENTORY SYSTEM WITH INVENTORY-DEPENDENT PRODUCTION-RATE

Sung, Chang Sup; HAN, YH, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.29, no.1, pp.11 - 25, 1993-02

83
OPTIMAL PRODUCTION POLICY FOR A SINGLE-PRODUCT SINGLE-MACHINE PROBLEM WITH INTERMEDIATE MACHINE INSPECTION ALLOWED

Sung, Chang Sup; OCK, YS, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.28, no.1, pp.85 - 94, 1992-11

84
Optimum Ordering Policies for an Equipment with a Sensing Device

Sung, Chang Sup, MICROELECTRONICS RELIABILITY, v.26, no.1, pp.87 - 98, 1986-04

85
Optimum Ordering Policy under Random Lead-Time for Equipment with a Sensor

Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.36, no.4, pp.467 - 469, 1987-10

86
PARAMETRIC MAX-FLOW PROBLEMS IN A CLASS OF NETWORKS WITH SERIES-PARALLEL STRUCTURE

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.21, no.7, pp.769 - 776, 1994-01

87
Performance Analysis of a Queueing System with Facilities Requiring Post-Processing

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.19, no.8, pp.767 - 781, 1992-01

88
PERFORMANCE MODELING OF AN FMS WITH FINITE INPUT AND OUTPUT BUFFERS

Sung, Chang Sup; KWON, ST, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.37, no.2-3, pp.161 - 175, 1994-12

89
Production Planning and Shipment Scheduling for a Multi-Product ( 1:1:N) Inventory Model with Cyclic Production Policy Incorporated

Sung, Chang Sup, 2003 MSOM conference(INFORMS), pp.1 - 16, 2003

90
Production-Delivery Scheduling Problem in Supply Chain Management

Sung, Chang Sup, Multi-Echelon/MSOM 2004, 2004

91
(r,Q) Policy for a Single-Product Production/Inventory Problem with a Compound Poisson Demand Process

Sung, Chang Sup; geun tae oh, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.30, no.2, pp.132 - 149, 1987-01

92
Receiver set partitioning and sequencing for multicasting traffic in a WDM lightwave single-hop network

Sung, Chang Sup; Rim, HC, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.55, no.6, pp.630 - 639, 2004-06

93
Reliability Optimization of a Series System with Multiple-Choice and Budget Constraints

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.127, no.1, pp.159 - 171, 2000-11

94
ROLLING SCHEDULES FOR A DYNAMIC LOT-SIZING PROBLEM WITH START-UP COST

Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.22, no.2, pp.137 - 152, 1994

95
Routing for a Multicommodity Traffic Problem with Transmission Delay and Load Balancing Considered

Sung, Chang Sup; Yang W., Proceedings of the International Conference on Communications in Computing, CIC'03, pp.86 - 92, 2003-06-23

96
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

97
Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing

Sung, Chang Sup, pp.0 - 0, 1993-04-01

98
Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

99
Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility

Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01

100
SETUP COST REDUCTION IN A DYNAMIC LOT-SIZE MODEL WITH MULTIPLE FINITE PRODUCTION-RATES

Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.24, no.1, pp.19 - 37, 1995

101
Simple Enumeration of Minimal Cutsets Separating 2 Vertices in a Class of Undirected Planar Graphs

Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.41, no.1, pp.63 - 71, 1992-01

102
Single Machine Product Scheduling with Outsourcing Allowed

Sung, Chang Sup, Multidisciplinary International Conference on Scheduling:Theory and Applications(MISTA), pp.1 - 23, 2005

103
Single machine scheduling with outsourcing allowed

Lee, Ik Sun; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.111, no.2, pp.623 - 634, 2008-02

104
Technical Note on a Parallel-Facilities Production Planning Model with CapacityConstraints

Sung, Chang Sup; j. h. byun, COMPUTERS AND OPERATIONS RESEARCH, v.15, no.6, pp.585 - 587, 1988-01

105
Trend in IT Development in 21st Century

Sung, Chang Sup, International Conference on Business, Technology & Intellectual Property in IT Age, pp.129 - 138, 2001

rss_1.0 rss_2.0 atom_1.0