Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Type Article

Showing results 1561 to 1620 of 2154

1561
Scheduling for an arc-welding robot considering heat-caused distortion

Kim, HJ; Kim, Yeong-Dae; Lee, DH, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.56, pp.39 - 50, 2005-01

1562
Scheduling healthcare services in a home healthcare system

An, Y-J; Kim, Yeong-Dae; Jeong, B. J.; Kim, S-D, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.63, no.11, pp.1589 - 1599, 2012-11

1563
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

1564
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

1565
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

1566
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning

Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04

1567
Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

1568
Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility

Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01

1569
Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem

Kim, H.; Kang, J.; Park, Sungsoo, ASIA PACIFIC MANAGEMENT REVIEW, v.7, no.1, pp.119 - 138, 2002-01

1570
Scheduling of step-improving jobs with an identical improving rate

Kim, Hyunjung; Kim, Eun-Seok; Lee, Jun-Ho, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.73, no.5, pp.1127 - 1136, 2022-05

1571
Scheduling on parallel identical machines to minimize total tardiness

Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02

1572
Scheduling problem in a two-machine flow line with the N- step prio-fob-dependent set-up times

Hwang, Hark, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.32, no.3, pp.375 - 385, 2001-01

1573
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

1574
Scheduling single-armed cluster tools with reentrant wafer flows

Lee, HY; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.19, no.2, pp.226 - 240, 2006-05

1575
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation

Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012

1576
Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers

Kim, Hyun-Jung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.126, 2021-02

1577
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility

Kim, Yeong-Dae; Joo, BJ; Choi, SY, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.23, pp.246 - 254, 2010-05

1578
Sculptured surface NC machining

Choi, Byoung Kyu; B.H.Kim; R.B.Jerard, COMPUTER AIDED GEOMETRIC DESIGN, 2002-08

1579
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process

Kim, Yeong-Dae; Lim, HG; Park, MW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.1, pp.124 - 143, 1996-05

1580
Search heuristics for a parallel machine scheduling problem with ready times and due dates

Park, MW; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.793 - 796, 1997-12

1581
Search Heuristics for a Parallel Machine Scheduling Problem with Ready Times and Due Dates

Kim, Y-D.; Park, Moon-Won, Computer and Industrial Engineering, vol.33, no.3-4, pp.793-796, 1997

1582
Search heuristics for resource constrained project scheduling

Lee, Jae-Kwan; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.47, no.5, pp.678 - 689, 1996-05

1583
Search Personalization in Folksonomy by Exploiting Multiple and Temporal Aspects of User Profiles

Han, Keejun; Yi, Mun Yong; Kim, Jungeun, IEEE ACCESS, v.7, pp.95610 - 95619, 2019-07

1584
Search-based heuristic algorithms for basic planning in a large shipyard

Lee, Tae-Eog; Song J.S; Im J.C; Park JC; Jeong DS; Lee KR, JOURNAL OF SHIP PRODUCTION, v.12, no.4, pp.211 - 219, 1996-11

1585
SECAM: A Supervisory Equipment Control Application Model for Integrated Semiconductor Manufacturing Equipment,

Lee, JH; Lee, Tae-Eog, IEEE ROBOTICS & AUTOMATION MAGAZINE, v.11, no.1, pp.41 - 58, 2004-03

1586
Secure query processing against encrypted XML data using Query-Aware Decryption

Lee, Jae-Gil; Whang, Kyu-Young, INFORMATION SCIENCES, v.176, no.13, pp.1928 - 1947, 2006-07

1587
Selection between Weibull and lognormal distributions: A comparative simulation study

Kim, Jin Seon; Yum, Bong-Jin, COMPUTATIONAL STATISTICS DATA ANALYSIS, v.53, no.2, pp.477 - 485, 2008-12

1588
Self-adaptive and dynamic clustering for online anomaly detection

Lee, Seung-Min; Kim, Gi-Sung; Kim, Se-Hun, EXPERT SYSTEMS WITH APPLICATIONS, v.38, no.12, pp.14891 - 14898, 2011

1589
Self-intersection removal in triangular mesh offsetting

Jung, W; Shin, Hayong; Choi, B.K, COMPUTER-AIDED DESIGN AND APPLICATIONS, v.1, no.1-4, pp.477 - 484, 2004

1590
Self-supervised graph representation learning via positive mining

Lee, Namkyeong; Lee, Junseok; Park, Chanyoung, INFORMATION SCIENCES, v.611, pp.476 - 493, 2022-09

1591
Semantic relation based personalized ranking approach for engineering document retrieval

Hahm, Gyeong June; Lee, Jae Hyun; Suh, Hyo Won, ADVANCED ENGINEERING INFORMATICS, v.29, no.3, pp.366 - 379, 2015-08

1592
Semi-Supervised Learning for Simultaneous Location Detection and Classification of Mixed-Type Defect Patterns in Wafer Bin Maps

Lee, Hyuck; Lee, Jaehyun; Kim, Heeyoung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.36, no.2, pp.220 - 230, 2023-05

1593
Semi-Supervised Multi-Label Learning for Classification of Wafer Bin Maps With Mixed-Type Defect Patterns

Lee, Hyuck; Kim, Heeyoung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.33, no.4, pp.653 - 662, 2020-11

1594
Semiconductor FAB layout design analysis with 300-mm FAB data: "Is minimum distance-based layout design best for semiconductor FAB design?"

Kim, Junghoon; Yu, Gwangjae; Jang, Young Jae, COMPUTERS INDUSTRIAL ENGINEERING, v.99, pp.330 - 346, 2016-09

1595
Semiconductor manufacturing intelligence and automation Foreward

Chien, Chen-Fu; Hsu, Chia-Yu; Morrison, James R; Dou, Runliang, COMPUTERS & INDUSTRIAL ENGINEERING, v.99, pp.315 - 317, 2016-09

1596
Sensitivity of wardrop equilibria: revisited

Takalloo, Mahdi; Kwon, Changhyun, OPTIMIZATION LETTERS, v.14, no.3, pp.781 - 796, 2020-04

1597
Sequence-order-independent network profiling for detecting application layer DDoS attacks

Lee, Sang-Jae; Kim, Gi-Sung; Kim, Se-Hun, EURASIP JOURNAL ON WIRELESS COMMUNICATIONS AND NETWORKING, v.2011, no.50, 2011-08

1598
Sequencing delivery and receiving operations for yard cranes in port container terminals

Kim, Kap-Hwan; Lee, Keung-Mo; Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.84, no.3, pp.283 - 292, 2003-06

1599
Sequencing for a Mixed Model Assembly Line in Just-In-Time Production System

황학, KOREAN MANAGEMENT SCIENCE REVIEW, v.11, no.1, 1994-01

1600
SEQUENCING PICKING OPERATIONS AND TRAVEL TIME MODELS FOR MAN-ON-BOARD STORAGE AND RETRIEVAL WAREHOUSING SYSTEM

Hwang, Hark; jin-young song, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.29, no.1, pp.75 - 88, 1993

1601
Sequential Likelihood-Free Inference with Neural Proposal

Kim, Dongjun; Song, Kyungwoo; Kim, Yoon-Yeong; Shin, Yongjin; Kang, Wanmo; Moon, Il-Chul; Joo, Weonyoung, PATTERN RECOGNITION LETTERS, v.169, pp.102 - 109, 2023-05

1602
Server unavailability reduces mean waiting time in some batch service queuing systems

Lee, HW; Chung, DI; Lee, SS; Chae, Kyung-Chul, COMPUTERS OPERATIONS RESEARCH, v.24, no.6, pp.559 - 567, 1997-06

1603
SETUP COST REDUCTION IN A DYNAMIC LOT-SIZE MODEL WITH MULTIPLE FINITE PRODUCTION-RATES

Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.24, no.1, pp.19 - 37, 1995

1604
SEX-DIFFERENCES IN ANTHROPOMETRY FOR SCHOOL FURNITURE DESIGN

JEONG, BY; Park, Kyung Soo, ERGONOMICS, v.33, no.12, pp.1511 - 1521, 1990-12

1605
Shifting artificial data to detect system failures

Hwang, Wook-Yeon; Lee, Jong-Seok, INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, v.22, no.2, pp.363 - 378, 2015-03

1606
Shilling Attack Detection-A New Approach for a Trustworthy Recommender System

Lee, Jong-Seok; Zhu, Dan, INFORMS JOURNAL ON COMPUTING, v.24, no.1, pp.117 - 131, 2012

1607
Simple Enumeration of Minimal Cutsets Separating 2 Vertices in a Class of Undirected Planar Graphs

Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.41, no.1, pp.63 - 71, 1992-01

1608
Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility

Kim, Yeong-Dae; Shim, SO; Choi, B; Hwang, Hark, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, pp.290 - 298, 2003-05

1609
Simulated annealing algorithms for locating pickup and delivery points in an automated guided vehicle system

Kim, Jae-Gon; Kim, Yeong-Dae; Lee, Dong-Ho, JOURNAL OF ENGINEERING VALUATION AND COST ANALYSIS, v.3, no.4-5, pp.205 - 215, 2000

1610
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure

Kim, JU; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.23, no.9, pp.857 - 868, 1996-09

1611
Simulation Analyses of Finishing Processes in a Tire Manufacturing system

최재영; 이채영, 경영과학, v.7, no.1, pp.44 - 52, 1990-07

1612
Simulation as a Tool for Operations Research

박경수, 한국국방경영분석학회지, v.2, no.2, pp.21 - 28, 1977-04

1613
Simulation Experiment of Disaster Response Organizational Structures With Alternative Optimization Techniques

Lee, GeunHo; Bae, Jang Won; Oh, Namkyung; Hong, Jeong Hee; Moon, Il-Chul, SOCIAL SCIENCE COMPUTER REVIEW, v.33, no.3, pp.343 - 371, 2015-06

1614
Simulation of Tempered Stable Levy Bridges and Its Applications

Kim, Kyoung-Kuk; Kim, Sojung, OPERATIONS RESEARCH, v.64, no.2, pp.495 - 509, 2016-03

1615
Simulation-based analyses of an evacuation from a metropolis during a bombardment

Bae, Jang Won; Lee, SeHoon; Hong, Jeong Hee; Moon, Il-Chul, SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, v.90, no.11, pp.1244 - 1267, 2014-11

1616
SIMULATION-BASED REAL-TIME SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM

KIM, MH; Kim, Yeong-Dae, JOURNAL OF MANUFACTURING SYSTEMS, v.13, no.2, pp.85 - 93, 1994

1617
Simultaneous band selection and segmentation of hyperspectral images via a mixture of finite maximum margin mixtures

Doo, Woojin; Kim, Heeyoung, INTERNATIONAL JOURNAL OF REMOTE SENSING, v.43, no.6, pp.2296 - 2314, 2022-03

1618
Simultaneous Deep Clustering and Feature Selection via K-Concrete Autoencoder

Doo, Woojin; Kim, Heeyoung, IEEE TRANSACTIONS ON KNOWLEDGE AND DATA ENGINEERING, v.36, no.6, pp.2629 - 2642, 2024-06

1619
Simultaneous Improvement of Supplier's Profit and Buyer's Cost by Utilizing Quantity Discount

kap hwan kim; Hwang, Hark, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.40, no.3, pp.255 - 265, 1989

1620
Simultaneous Location of Trauma Centers and Helicopters for Emergency Medical Service Planning

Cho, Soo-Haeng; Jang, Hoon; Lee, Tae-Sik; Turner, John, OPERATIONS RESEARCH, v.62, no.4, pp.751 - 771, 2014-07

rss_1.0 rss_2.0 atom_1.0