Lead time estimation method for complex product development process

Cited 17 time in webofscience Cited 0 time in scopus
  • Hit : 444
  • Download : 0
As the lifecycle of a product gets shorter, the timely introduction of new products becomes an invaluable asset to most manufacturing firms. It is needless to say that the competitive edge is given to a firm with the better knowledge on how to estimate the product development (PE) process because reducing the product development time is a critical issue for manufacturing firms. However, it is difficult to estimate the performance of the PD process because of its complexity. So far, in spite of its strategic importance, only a few studies have been done. To overcome this limitation, in this study, the authors provide a heuristic algorithm that can estimate the lead time of a complex PD process by series-parallel network transformation and network reduction methods with estimates of the makespans of branch-merge types. To show the usefulness of this method, computational experiments have been carded out.
Publisher
SAGE PUBLICATIONS LTD
Issue Date
2006-12
Language
English
Article Type
Article
Keywords

ENGINEERING DESIGN; PERT NETWORKS; ITERATION; INFORMATION; MANAGEMENT; FRAMEWORK; SYSTEM; MODEL; GERT

Citation

CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, v.14, no.4, pp.313 - 328

ISSN
1063-293X
DOI
10.1177/1063293X06073302
URI
http://hdl.handle.net/10203/90832
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 17 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0