Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems

Cited 6 time in webofscience Cited 0 time in scopus
  • Hit : 771
  • Download : 6
This paper focuses on multi-period order selection and loading problems in flexible manufacturing systems. The multi-period order selection problem is the problem of selecting orders to be produced in each period during the upcoming planning horizon, and the loading problem involves allocation of operations and required tools to machines for orders selected in each period. The objective is to minimize earliness and tardiness costs and subcontracting costs. The earliness and tardiness costs are incurred if an order is not finished on time, while subcontracting cost is incurred if an order is not selected within the planning horizon (and must be subcontracted) due to limits in processing time capacity and the tool magazine capacity of the machines. To solve the two problems simultaneously, we develop four iterative procedures in which the multi-period order selection and loading problems are solved repeatedly until a good solution is obtained. To compare the four iterative procedures, computational experiments are done on randomly generated test problems and the results are reported.
Publisher
TAYLOR FRANCIS LTD
Issue Date
1998-10
Language
English
Article Type
Article
Keywords

PART TYPE SELECTION

Citation

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.10, pp.2653 - 2668

ISSN
0020-7543
URI
http://hdl.handle.net/10203/7585
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 6 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0