Results 1-10 of 11 (Search time: 0.007 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes Chien, CF; Dauzere-Peres, S; Ehm, H; Fowler, JW; Jiang, ZB; Krishnaswamy, S; Lee, Tae-Eog; Monch, L; Uzsoy, R, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, no.3, pp.254 - 271, 2011 | |
Feedback Control of Cluster Tools for Regulating Wafer Delays Kim, Chulhan; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1189 - 1199, 2016-04 | |
SECAM: A Supervisory Equipment Control Application Model for Integrated Semiconductor Manufacturing Equipment, Lee, JH; Lee, Tae-Eog, IEEE ROBOTICS & AUTOMATION MAGAZINE, v.11, no.1, pp.41 - 58, 2004-03 | |
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02 | |
Virtual control - A virtual cluster tool for testing and verifying a cluster tool controller and a scheduler Joo, YJ; Lee, Tae-Eog, IEEE ROBOTICS & AUTOMATION MAGAZINE, v.11, no.3, pp.33 - 49, 2004-09 | |
Wafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations Yu, Tae-Sun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.58, no.2, pp.434 - 447, 2020-01 | |
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04 | |
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05 | |
Wafer Delay Analysis and Workload Balancing of Parallel Chambers for Dual-Armed Cluster Tools With Multiple Wafer Types Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.18, no.3, pp.1516 - 1526, 2021-07 | |
Adaptive Scheduling of Cluster Tools With Wafer Delay Constraints and Process Time Variation Lim, Yuchul; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.1, pp.375 - 388, 2020-01 |
Discover