Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 11-20 of 35 (Search time: 0.003 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
11
Machine capacity allocation strategies for scheduling a large multi-chip assembly line

Lee, Sang-Jin; Lee, Tae-Eog, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, pp.327 - 337, 2011

12
A New Class of Sequences Without Interferences for Cluster Tools With Tight Wafer Delay Constraints

Lim, Yuchul; Yu, Tae Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.1, pp.392 - 405, 2019-01

13
Scheduling Dual-Armed Cluster Tools with Chamber Cleaning Operations

Yu, Tae Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.1, pp.218 - 228, 2019-01

14
Schedule Restoration for Single-Armed Cluster Tools

Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08

15
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE

Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12

16
K-Cyclic Schedules and the Worst-Case Wafer Delay in a Dual-Armed Cluster Tool

Roh, Dong-Hyun; Lee, Tae-Gyung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.32, no.2, pp.236 - 249, 2019-05

17
Modelling and Simulation of a River-Crossing Operation via Discrete Event Simulation with Engineering Details

Jung, Chungjo; Yun, Woo-Seop; Moon, Il-Chul; Lee, Tae-Eog, DEFENCE SCIENCE JOURNAL, v.65, no.2, pp.135 - 143, 2015-03

18
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

19
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

20
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

rss_1.0 rss_2.0 atom_1.0