Scheduling Dual-Armed Cluster Tools with Chamber Cleaning Operations

Cited 21 time in webofscience Cited 15 time in scopus
  • Hit : 544
  • Download : 0
Circuit widths and nodes of semiconductor wafers have been continually shrinking down to less than 20 nm. Therefore, modern wafer fabs enforce extremely strict process control to prevent wafer quality failures. A wafer processing chamber is now frequently cleaned to remove residual chemicals and impurities. Yu et al. show that such cleaning operations significantly change the tool operation of single-armed cluster tools, and they suggest an idea of partial wafer loading to improve the tool throughput under cleaning requirements. However, little is known about how a dual-armed tool could be effectively scheduled when chamber cleaning exists. A dual-armed robot allows more flexible tool operational sequences, and hence, the scheduling problem becomes further complicated and challenging. In this paper, we propose a scheduling method by which the dual arms can be properly exploited for better tool productivity. We show that the suggested hybrid sequence significantly reduces the tool cycle time as compared to previously developed scheduling methods. Through this research, we conclude that the productivity gain of the dual arms against single arm is more significant when chambers are cleaned.
Publisher
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
Issue Date
2019-01
Language
English
Article Type
Article
Citation

IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.1, pp.218 - 228

ISSN
1545-5955
DOI
10.1109/TASE.2017.2764105
URI
http://hdl.handle.net/10203/250175
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 21 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0