Results 1-9 of 9 (Search time: 0.008 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Lead time estimation method for complex product development process Jun, Hong-Bae; Park, Jin-Young; Suh, Hyo-Won, CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, v.14, no.4, pp.313 - 328, 2006-12 | |
Workflow structuring and reengineering method for design process Lee, Heejung; Suh, Hyo-Won, COMPUTERS & INDUSTRIAL ENGINEERING, v.51, pp.698 - 714, 2006-12 | |
An optimal operating policy for the production system with rework Liu, Ning; Kim, Youngjoo; Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.56, no.3, pp.874 - 887, 2009-04 | |
Incremental discount policy for taxi fare with price-sensitive demand Kim, Young-Joo; Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.112, no.2, pp.895 - 902, 2008-04 | |
Capacity-filtering algorithms for finite-capacity planning of a flexible flow line Choi, Byoung Kyu; Seo, J. C., INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.47, no.12, pp.3363 - 3386, 2009 | |
A genetic algorithm approach to an integrated problem of shelf space design and item allocation Hwang, Hark; Choi, Bum; Lee, Grimi, COMPUTERS & INDUSTRIAL ENGINEERING, v.56, no.3, pp.809 - 820, 2009-04 | |
Analysis of a Multi-Part Spares Inventory System subject to Ambiguous Fault Isolation Sung, Chang Sup; s. h. kim, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.52, no.4, pp.418 - 432, 2001-04 | |
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02 | |
The training effects of principle knowledge on fault diagnosis performance Ham, DH; Yoon, Wan Chul, HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING, v.17, pp.263 - 282, 2007-05 |