Browse "IE-Journal Papers(저널논문)" by Author Kim, Hyunjung

Showing results 1 to 25 of 25

1
A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets

Jung, Chihyun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01

2
A Branch and Bound Algorithm for Three-Machine Flow Shop with Overlapping Waiting Time Constraints

Kim, Hyunjung; Lee, JH, IFAC PAPERSONLINE, v.50, no.1, pp.1101 - 1105, 2017-07

3
Bounds for parallel machine scheduling with predefined parts of jobs and setup time

Kim, Hyunjung, ANNALS OF OPERATIONS RESEARCH, v.261, no.1-2, pp.401 - 412, 2018-02

4
Characterizing Token Delays of Timed Event Graphs for K-Cyclic Schedules

Lee, Tae-Eog; Kim, Hyunjung; Roh, Dong-Hyun; Sreenivas, Ramavarapu S., IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.62, no.2, pp.961 - 966, 2017-02

5
Closed-Form Expressions on Lot Completion Time for Dual-Armed Cluster Tools With Parallel Processing Modules

Kim, Hyunjung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.2, pp.898 - 907, 2019-04

6
Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules

Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.14, no.4, pp.1622 - 1633, 2017-10

7
Cyclic robot scheduling for 3D printer-based flexible assembly systems

Kim, Hyunjung; Lee, JH, Annals of Operations Research, v.298, no.1-2, pp.339 - 359, 2021-03

8
Implementation of Cyber-Physical Production Systems for Quality Prediction and Operation Control in Metal Casting

Lee, JuneHyuck; Noh, Sang Do; Kim, Hyunjung; Kang, Yong-Shin, SENSORS, v.18, no.5, 2018-05

9
Makespan Analysis of Lot Switching Period in Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.29, no.2, pp.127 - 136, 2016-05

10
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

11
Non-Cyclic Scheduling of a Wet Station

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.4, pp.1262 - 1274, 2014-10

12
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04

13
Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

Kim, Dae-Kyu; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07

14
Optimal Scheduling of Transient Cycles for Single-Armed Cluster Tools With Parallel Chambers

Kim, Dae-Kyu; Lee, Tae-Eog; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1165 - 1175, 2016-04

15
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

16
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04

17
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

18
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

19
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

20
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

21
Scheduling of step-improving jobs with an identical improving rate

Kim, Hyunjung; Kim, Eun-Seok; Lee, Jun-Ho, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.73, no.5, pp.1127 - 1136, 2022-05

22
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

23
Three-machine flow shop scheduling with overlapping waiting time constraints

Kim, Hyunjung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.101, pp.93 - 102, 2019-01

24
Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07

25
Vulnerability Analysis of Evacuation Transportation Networks

Kim, Jun; Lee, Je-Hun; Kim, Hyunjung; Chung, Byung Do, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.5, pp.663 - 673, 2018

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0