Showing results 8 to 25 of 25
Implementation of Cyber-Physical Production Systems for Quality Prediction and Operation Control in Metal Casting Lee, JuneHyuck; Noh, Sang Do; Kim, Hyunjung; Kang, Yong-Shin, SENSORS, v.18, no.5, 2018-05 |
Makespan Analysis of Lot Switching Period in Cluster Tools Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.29, no.2, pp.127 - 136, 2016-05 |
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05 |
Non-Cyclic Scheduling of a Wet Station Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.4, pp.1262 - 1274, 2014-10 |
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04 |
Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module Kim, Dae-Kyu; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07 |
Optimal Scheduling of Transient Cycles for Single-Armed Cluster Tools With Parallel Chambers Kim, Dae-Kyu; Lee, Tae-Eog; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1165 - 1175, 2016-04 |
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07 |
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04 |
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10 |
Scheduling dual-armed cluster tools with cleaning processes Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06 |
Scheduling In-Line Multiple Cluster Tools Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05 |
Scheduling Lot Switching Operations for Cluster Tools Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11 |
Scheduling of step-improving jobs with an identical improving rate Kim, Hyunjung; Kim, Eun-Seok; Lee, Jun-Ho, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.73, no.5, pp.1127 - 1136, 2022-05 |
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04 |
Three-machine flow shop scheduling with overlapping waiting time constraints Kim, Hyunjung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.101, pp.93 - 102, 2019-01 |
Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07 |
Vulnerability Analysis of Evacuation Transportation Networks Kim, Jun; Lee, Je-Hun; Kim, Hyunjung; Chung, Byung Do, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.5, pp.663 - 673, 2018 |
Discover