Implications of Cost Equity Consideration in Hazmat Network Design

Cited 7 time in webofscience Cited 0 time in scopus
  • Hit : 66
  • Download : 0
The hazardous materials (hazmat) network design problem (HNDP) is used to reduce the risk of transporting hazmat in the network by enforcing regulation policies. The goal of reducing risk can increase costs for hazmat carriers. Because the HNDP involves multiple parties, the cost increase for all carriers must be considered for implementation of regulations. Although upper bounds can be placed on the total increase, the actual cost increase for various origin destination pairs can differ, resulting in unfairness among carriers. Thus, also considering cost equity in the HNDP is proposed. Additionally, because there are multiple solutions in current HNDP models and because of the possibility of unnecessarily closing road segments, a new objective considering the length of all the closed links is introduced. Computational experience is based on a real network, and results are shown for various cost consideration cases.
Publisher
NATL ACAD SCIENCES
Issue Date
2016
Language
English
Article Type
Article
Citation

TRANSPORTATION RESEARCH RECORD, no.2567, pp.67 - 77

ISSN
0361-1981
DOI
10.3141/2567-08
URI
http://hdl.handle.net/10203/312019
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 7 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0