Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 3941 to 3960 of 6103

3941
Scheduling of cluster tools with independent dual-arm under wafer delay constraints = 체재시간 제약을 가지는 독립된 두 팔 클러스터 장비의 스케줄링link

Kwon, Yongmin; Lee, Tae-Eog; et al, 한국과학기술원, 2017

3942
Scheduling of cluster tools with k-periodic chamber cleaning operationslink

Lee, Tae-Gyung; Lee, Tae-Eog; et al, 2021

3943
Scheduling of cluster tools with ready time constraints for small lot production

Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25

3944
Scheduling of dual independent armed cluster tool with unbalanced workload = 독립적인 두팔을 가진 클러스터 장비의 불균형한 워크로드 스케쥴링link

Sheen, Dong Yup; 신동엽; et al, 한국과학기술원, 2015

3945
Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations

이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05

3946
Scheduling of Dual-armed Cluster Tools with k-periodic Chamber Cleaning

LEE, TAE GYUNG; Lee, Tae-Eog, 2018 대한산업공학회 추계학술대회, pp.747 - 777, 대한산업공학회, 2018-11-09

3947
Scheduling of Dual-Armed Cluster Tools with Time Constraints

Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04

3948
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning

Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04

3949
Scheduling of manufacturing systems with reentrant work flows and sequence dependent setup times = 작업 순서에 종속적인 세트업시간 및 재진입 작업 흐름을 갖는 제조시스템의 스케쥴링link

Sun, Ji-Ung; 선지웅; et al, 한국과학기술원, 1999

3950
Scheduling of multi-level parts in a flexible manufacturing system = 유연 제조 시스템에서 다단계 부품의 일정 계획에 관한 연구link

Kim, Jung-Ug; 김정욱; et al, 한국과학기술원, 1994

3951
Scheduling of multi-slot cluster tools with wafer delay constraintslink

Jee, Young-Jun; Lee, Tae-Eog; et al, 2021

3952
Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

3953
Scheduling of periodically-arriving task batches = 동적 수요를 위한 선행관계에 있는 과제집단의 일정계획link

Yoon, Sang-Hum; 윤상흠; et al, 한국과학기술원, 1992

3954
Scheduling of Petri nets as a multi-objective shortest path problem

Wikborg, Uno; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22

3955
Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility

Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01

3956
Scheduling of real-time and nonreal-time traffics in IEEE 802.11 wireless LANs = IEEE 802.11 무선 랜 시스템에서의 실시간 및 비실시간 트래픽 스케쥴링link

Lee, Ju-Hee; 이주희; et al, 한국과학기술원, 2002

3957
Scheduling of real-time traffics in IEEE 802.11 wireless LANs = IEEE 802.11 무선 랜 시스템에서의 실시간 트래픽 스케쥴링link

Jeong, Dong-Woon; 정동운; et al, 한국과학기술원, 2003

3958
Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem

김희문; 강장하; 박성수, 한국경영과학회/대한산업공학회 춘계공동학술대회, pp.697 - 703, 2002

3959
Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem

Kim, H.; Kang, J.; Park, Sungsoo, ASIA PACIFIC MANAGEMENT REVIEW, v.7, no.1, pp.119 - 138, 2002-01

3960
Scheduling of step-improving jobs with an identical improving rate

Kim, Hyunjung; Kim, Eun-Seok; Lee, Jun-Ho, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.73, no.5, pp.1127 - 1136, 2022-05

rss_1.0 rss_2.0 atom_1.0