Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 2941 to 2960 of 6101

2941
Minimax Approach for Logical Configuration in Reconfigurable Virtual Circuit Data Network

Sung, Chang Sup; park, s.k., IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, v.E78A, no.8, pp.1029 - 1033, 1995-08

2942
Minimax Risks and Optimal Procedures for Estimation under Functional Local Differential Privacy

Lee, Bonwoo; Ahn, Jeongyoun; Park, Cheolwoo, 37th Conference on Neural Information Processing Systems, NeurIPS 2023, Neural information processing systems foundation, 2023-12-13

2943
Minimization of side effects in sensitive information hiding = 민감한 정보를 숨기는 방법에 있어서 부작용을 최소화하는 방안에 관한 연구link

Lee, Young-Min; 이영민; et al, 한국과학기술원, 2014

2944
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

2945
Minimizing bullwhip effect in supply chains

Duc, T.T.H.; Luong, H.T.; Kim, Yeong-Dae, IEEE International Conference on Industrial Engineering and Engineering Management, IEEM2010, pp.225 - 229, IEEE, 2010-12-07

2946
Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed

Lee, Ik Sun; Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.186, no.3, pp.931 - 952, 2008-05

2947
Minimizing Due Date Related Peformance Measures on Two Batch Processing Machines

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.147, no.3, pp.644 - 656, 2003-06

2948
Minimizing Early and Tardy Penalties in a Job Sequencing Problem Using Genetic Algorithms

Lee, Chae Young, Korean/Japan Joint Conference on Expert Systems, pp.609 - 632, 1993

2949
Minimizing makespan in a two-machine flowshop scheduling problem with delay time constraints = 두 단계 흐름 공정에서의 지연시간을 고려한 스케줄링에 관한 연구link

Son, Jung-Dae; 손정대; et al, 한국과학기술원, 2006

2950
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

An, Young-Jin; Kim, Yeong-Dae; Choi, Seong-Woo, COMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07

2951
Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed

성창섭, 한국경영과학회 추계학술대회, 2000

2952
Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed

Sung, Chang Sup; Kim, YH, COMPUTERS AND OPERATIONS RESEARCH, v.29, no.3, pp.275 - 294, 2002-02

2953
Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.120, no.3, pp.559 - 574, 2000-02

2954
Minimizing Makespan on a Single Burn-In Oven wih Job Families and Dynamic Job Arrivals Allowed

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.120, no.3, pp.559 - 574, 2000-10

2955
MINIMIZING MAKESPAN ON A TWO-MACHINE RE-ENTRANT FLOWSHOP

Choi, SW; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.19.1 - 31.19.10, 2004

2956
Minimizing makespan on a two-machine re-entrant flowshop

Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07

2957
Minimizing makespan on an m-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05

2958
Minimizing makespan on two-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, International Conference on Computers and Industrial Engineering, pp.CIE453 - CIE453, 2004

2959
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed

Sung, Chang Sup; Yoon, SH, ENGINEERING OPTIMIZATION, v.28, no.3, pp.231 - 243, 1997-04

2960
Minimizing mean flow time on a single batch-processing machine for the burn-in test operation of semiconductor manufacturing = 반도체 제조 burn-in공정을 위한 배치 공정 설비에서 평균 흐름시간 최소화문제link

Hong, Yang-Pyo; 홍양표; et al, 한국과학기술원, 1996

rss_1.0 rss_2.0 atom_1.0