Showing results 1 to 60 of 105
A BRANCH-AND-BOUND APPROACH FOR SPARE UNIT ALLOCATION IN A SERIES SYSTEM Sung, Chang Sup; LEE, HK, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.75, no.1, pp.217 - 232, 1994-05 |
A Capacitated Location-Routing Problem with Time Windows Considered Sung, Chang Sup, INFORMS 2004, 2004 |
A Capacity Planning Model for a Multi-Product Facility Sung, Chang Sup; s. h. chang, ENGINEERING OPTIMIZATION, v.10, no.0, pp.263 - 270, 1987-01 |
A Capacity-Constrained Single-Facility Multi-Product Production Planning Model Sung, Chang Sup; s. h. chang, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.29, no.3, pp.232 - 245, 1986-09 |
A component-based product data management system Sung, Chang Sup; Park, Sam Joon, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.33, no.5-6, pp.614 - 626, 2007 |
A Constrained Single Machine Scheduling Model with Earliness/Tardiness and Flow Time Measures Joo, Un Gi; Sung, Chang Sup, 한국경영과학회지, v.20, no.1, pp.115 - 130, 1995-04 |
A Dynamic Production Scheduling Model with Lost-Sales or Backlogging Sung, Chang Sup; j. t. rhee, COMPUTERS & OPERATIONS RESEARCH, v.14, no.2, pp.163 - 171, 1987-04 |
A Heuristic Procedure of Cell Grouping and Channel Allocation for an Optical Feeder Micro Cellular System Sung, Chang Sup, IASTED International Conference on Wireless and Optical Communications, IASTED, 2001-06 |
A Micro Approach in Science and Engineering Manpower Forecasting : An Experience in Korea Sung, Chang Sup, pp.32 - 41, 1983-04-01 |
A Multifacility in Series Production Planning Model with Capacity Constraints Sung, Chang Sup, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.18, no.4, pp.623 - 632, 1986-04 |
A Neural Network Approach for Batching Decisions in Wafer Fabrication Sung, Chang Sup, pp.0 - 0, 1997-01-01 |
A Neural Network Approach for Batching Decisions in Wafer Fabrication Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.37, no.13, pp.3101 - 3114, 1999-09 |
A Pricing and Inventory Control Model for a Perishable Product in a Two-Echelon Supply Chain Sung, Chang Sup, INFORMS 2004, 2004 |
A Problem Reduction and Decomposition Approach for Scheduling for a Flowshop of Batch Processing Machines Sung, Chang Sup; young hwan kim; sang hum yoon, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.121, no.1, pp.179 - 192, 2000-02 |
A Production Planning Model for Multi-Product Facilities Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.28, no.4, pp.345 - 358, 1985-12 |
A Production Scheduling Problem with Dynamic Delivery Cost Sung, Chang Sup, 17th Triennial Conference of IFORS, pp.1 - 28, 2005 |
A PROJECT ACTIVITY SCHEDULING PROBLEM WITH NET PRESENT VALUE MEASURE Sung, Chang Sup; LIM, SK, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.37, no.2-3, pp.177 - 187, 1994-12 |
A proportional-reduction-in-impurity measure of association for categorical variables Sung, Chang Sup; s. j. ahn, COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, v.27, no.8, pp.2083 - 2110, 1998 |
A real-time algorithm for timeslot assignment in ISM system with DVB-RCS Lee, Ik Sun; Sung, Chang Sup; Jin, Gwang-Ja; Han, Ki Seop, ETRI JOURNAL, v.29, no.3, pp.329 - 335, 2007-06 |
A ROUTING ALGORITHM FOR VIRTUAL CIRCUIT DATA-NETWORKS WITH UNRELIABLE LINKS Sung, Chang Sup; kang bae lee, ENGINEERING OPTIMIZATION, v.24, no.2, pp.119 - 136, 1995 |
A Scheduling Procedure for a General Class of Resource-Constrained Projects Sung, Chang Sup, COMPUTERS & INDUSTRIAL ENGINEERING, v.32, no.1, pp.9 - 17, 1997-04 |
A Simple Closed Form of the Long-Run Distribution of Stationary Inventory Position Processes in (R,r,T) Inventory Systems Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.25, no.2, pp.152 - 161, 1982-04 |
A Single Machine Scheduling Problem with Earliness/Tardiness and /starting Time Penalties under a Common Due Date Sung, Chang Sup; u. g. joo, COMPUTERS & OPERATIONS RESEARCH, v.19, no.8, pp.757 - 766, 1992-01 |
A Single-Product Parallel Facilities Production-Planning Model Sung, Chang Sup, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.17, no.7, pp.983 - 989, 1986-04 |
A Tabu-Search Based Clustering Algorithm Sung, Chang Sup, pp.0 - 0, 1996-01-01 |
A Tabu-Search-based Heuristic for Clustering Sung, Chang Sup; h. w. jin, PATTERN RECOGNITION, v.33, no.5, pp.849 - 858, 2000-04 |
A three-level supply chain network design model with risk-pooling and lead times Park, Sukun; Lee, Tae-Eog; Sung, Chang Sup, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, v.46, no.5, pp.563 - 581, 2010-09 |
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008 |
Allocating Base Stations in a DCS-Incorporated Mobile Radio Network Sung, Chang Sup, INFORMS National Meeting, 1995 |
AN ALGORITHM FOR CONFIGURING EMBEDDED NETWORKS IN RECONFIGURABLE TELECOMMUNICATION NETWORKS Sung, Chang Sup; Park, Sung Ki, TELECOMMUNICATION SYSTEMS, v.4, no.3-4, pp.241 - 271, 1995 |
An Analytical Framework for Configurating and Coordinating an Agent-based Virtual Enterprise to Support e-Business Sung, Chang Sup, Third International Workshop on Advanced Issues of e-Commerce and Web-based Information Systems, 2001 |
An Approach for the Optimal Production Rate of a Single Product System with Dynamic Demands Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.29, no.3, pp.177 - 190, 1986-09 |
An exact algorithm for a cross-docking supply chain network design problem Sung, Chang Sup; Yang, W., JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.59, no.1, pp.119 - 136, 2008-01 |
An Integrated Periodic Review Inventory Model for a Fixed-Life Perishable Commodity in an (M:N) Supply Chain Sung, Chang Sup, 17th Triennial Conference of IFORS, pp.1 - 20, 2005 |
An operation-sequence-based approach in designing a flow line independent-cell system with machine capacity incorporated Sung, Chang Sup; Park, YK; Cho, YK, ENGINEERING OPTIMIZATION, v.33, no.0, pp.153 - 178, 2000-04 |
Analysis of a Multi-Part Spares Inventory System subject to Ambiguous Fault Isolation Sung, Chang Sup; s. h. kim, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.52, no.4, pp.418 - 432, 2001-04 |
Analysis of an Assembly-Like Production Scheduling Problem Sung, Chang Sup, pp.0 - 0, 1993-04-01 |
Analysis of the Repair System in a Three-Stage Closed Queueing network Sung, Chang Sup; byeing jin Kim, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.18, no.4, pp.633 - 639, 1987-01 |
Batching to minimize weighted mean flow time on a single machine with batch size restrictions Sung, Chang Sup, COMPUTERS & INDUSTRIAL ENGINEERING, v.32, no.2, pp.333 - 340, 1997 |
Branch-and -Price Algorithm for a Combined Problemof Virtual Path Establishment and Traffic Packet Routing in a Layered Communivation Network Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.54, no.1, pp.72 - 82, 2003 |
Branch-and-Bound Approach for a Stochastic Production Planning Problem with capacity Constraints Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.31, no.4, pp.532 - 550, 1988-12 |
Branch-and-Bound Redundancy-Optimization for a Series System with Multiple-Choice Constraints Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.48, no.2, pp.108 - 117, 1999-06 |
Branch-and-Price Algorithm for a Multicast Routing Problem Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.11, pp.1168 - 1175, 1999-11 |
Combat Modeling of Remotely Targeted Vehicles and a Battery against a Moving Target Sung, Chang Sup, NAVAL RESEARCH LOGISTICS, v.45, no.7, pp.645 - 667, 1998-04 |
Configuring Both Backbone and Logical Networks for a Reconfigurable Network with Link Failures Allowed Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.26, no.0, pp.227 - 249, 1996-04 |
Continuous Review Inventory Policies for a Fixed-Lifetime Perishable Product in a (1:N) LIFO Distribution System Sung, Chang Sup, 2003MSOM conference(INFORMS), pp.1 - 19, 2003 |
Continuous Review(s,S) Inventory Model with Limited Backlogging Levels and Stochastic Lead Times Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.31, no.2, pp.252 - 264, 1988-06 |
Determination of Automated Storage/Retrieval System Size Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.19, no.4, pp.269 - 286, 1992-01 |
Determination of Initial Spares Stockage Levels in a Multi-Indentured Multi-Echelon Inventory System Sung, Chang Sup, the 20th International Conference on Computers and Industrial Engineering, pp.0 - 0, 1996-01-01 |
Development process of nuclear power industry in a developing country: Korean experience and implications Sung, Chang Sup; Hong, SK, TECHNOVATION, v.19, no.5, pp.305 - 316, 1999-05 |
Dual-based Approach for a Hub Network Design Problem under Nonrestrictive Policy Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.132, no.1, pp.88 - 105, 2001-11 |
Dynamic Lot Sizing for a Single Facility Multi-Product Problem in a Rolling-Horizon Environment Sung, Chang Sup, DECISION SCIENCES, v.18, no.2, pp.266 - 278, 1987-04 |
Effective Paging Procedure for the Optical Feeder Microcellular System Sung, Chang Sup; Rim, Hyoun Chul; Lee, Jung Sup, IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, v.52, no.4, pp.837 - 846, 2003-07 |
Ergodic Behavior of Nonstationary Finite Continuous - Time Markov Processes Sung, Chang Sup, pp.25 - 31, 1983-04-01 |
Fixed pre-assembly scheduling on multiple fabrication machines Yoon, Sang Hum; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.96, no.1, pp.109 - 118, 2005-04 |
Heurisic Algorithm for Minimizing Earliness-Tardiness on a Single Burn-in Oven in Semiconductor Manufacturing. Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing Sung, Chang Sup, International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp.217 - 222, 2002 |
Heuristic Algorithm for Minimizing Earliness-Tardiness on a Single Burn-In Oven in Semiconductor Manufacturing Sung, Chang Sup, International Conference on Modeling and Analysis of Semiconductor Manufacturing (2002), pp.1 - 6, 2002 |
Heuristic Algorithms for a Single-Machine Common Due Date Assignment under Earliness/Tardiness Measure Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.36, no.3, pp.121 - 133, 1993-04 |
Integrated service network design for a cross-docking supply chain network Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.54, no.12, pp.1283 - 1295, 2003-12 |
Inventory Control in an (1:1:N) SCM Model with Remanufacturing and Disposal Allowed Sung, Chang Sup, Asia Pacific Management Conference, 2004 |
Discover