Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Type Article

Showing results 1501 to 1520 of 2095

1501
Scalable Inference for Hybrid Bayesian Hidden Markov Model Using Gaussian Process Emission

Jung, Yohan; Park, Jinkyoo, JOURNAL OF COMPUTATIONAL AND GRAPHICAL STATISTICS, v.31, no.3, pp.666 - 683, 2022-07

1502
Scenario-based approach for the ambulance location problem with stochastic call arrivals under a dispatching policy

Sung, Inkyung; Lee, Tae-Sik, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.30, no.1-2, pp.153 - 170, 2018-06

1503
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

1504
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net

Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07

1505
Schedule Restoration for Single-Armed Cluster Tools

Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08

1506
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots

Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02

1507
Scheduling algorithms for a semiconductor probing facility

Bang, June-Young; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.38, no.3, pp.666 - 673, 2011-03

1508
Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines

Choi, YC; Kim, Yeong-Dae; Bang, JY, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12

1509
Scheduling algorithms for flexible manufacturing systems with partially grouped machines

Lee, DH; Kim, Yeong-Dae, JOURNAL OF MANUFACTURING SYSTEMS, v.18, no.4, pp.301 - 309, 1999

1510
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System

Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02

1511
SCHEDULING ALGORITHMS FOR MOBILE HARBOR: AN EXTENDED M-PARALLEL MACHINE PROBLEM

Sung, I.; Nam, H.; Lee, Taesik, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.20, no.1-2, pp.211 - 224, 2013

1512
Scheduling analysis of time-constrained dual-armed cluster tools

Kim, JH; Lee, Tae-Eog; Lee, HY; Park, DB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, no.3, pp.521 - 534, 2003-08

1513
Scheduling and control of automated manufacturing systems

Gunther, HO; Lee, Tae-Eog, OR SPECTRUM, v.29, no.3, pp.373 - 374, 2007-07

1514
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04

1515
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

1516
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

1517
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

1518
Scheduling Dual-Armed Cluster Tools with Chamber Cleaning Operations

Yu, Tae Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.1, pp.218 - 228, 2019-01

1519
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

1520
Scheduling for an arc-welding robot considering heat-caused distortion

Kim, HJ; Kim, Yeong-Dae; Lee, DH, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.56, pp.39 - 50, 2005-01

rss_1.0 rss_2.0 atom_1.0