Browse by Title 

Showing results 172661 to 172680 of 276282

172661
Scheduling flexible manufacturing systems with the consideration of setup times

Lee, Doo Yong; Dicesare, F, the 32nd IEEE Conference on Decision and Control, pp.3264 - 3269, 1993-12

172662
Scheduling for a flowshop of batch and discrete processing machines = 뱃치와 개별 생산 설비들로 구성된 Flowshop의 일정계획link

Kim, Young-Hwan; 김영환; et al, 한국과학기술원, 2001

172663
Scheduling for a Flowshop of Batch Processing Machines

성창섭, 한국경영과학회 추계학술대회, 1999

172664
Scheduling for Actual Size Refinery Processes Considering Environmental Impacts with Multiobjective Optimization

Song, Jehoon; Park, Hyungjin; Lee, Dong-Yup; Park, Sunwon, KIChE Fall Meeting, pp.3007 - 3010, KIChE, 2001

172665
Scheduling for an arc-welding robot considering heat-caused distortion

Kim, HJ; Kim, Yeong-Dae; Lee, DH, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.56, pp.39 - 50, 2005-01

172666
Scheduling for multiple machines with S-precedence constraints = 서비스 우선순위를 고려한 복합시스템 스케쥴링 연구link

Kim, Eun-Seok; 김은석; et al, 한국과학기술원, 2008

172667
Scheduling for poly vinyl chloride process operation = Poly vinyl chloride 공정 운전에 대한 일정계획link

Hwang, Jeong-Hwa; 황정화; et al, 한국과학기술원, 2003

172668
Scheduling for the Photolithography Process in Semiconductor Manufacturing

Chang Sup Sung, pp.0 - 0, 1996-04-01

172669
Scheduling healthcare services in a home healthcare system

An, Y-J; Kim, Yeong-Dae; Jeong, B. J.; Kim, S-D, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.63, no.11, pp.1589 - 1599, 2012-11

172670
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

172671
Scheduling in cellular cognitive radio network

Nguyen ,M.-V.; Yoon, Jangho; Lee, J.; Lee, Hwang Soo, 2011 IEEE Wireless Communications and Networking Conference, WCNC 2011, pp.126 - 131, IEEE, 2011-03-28

172672
Scheduling in Heterogeneous Computing Environments for Proximity Queries

Kim, Duk-Su; Lee, Jin-Kyu; Lee, Jung-Hwan; Shin, In-Sik; Kim, John Dongjun; Yoon, Sung-Eui, IEEE TRANSACTIONS ON VISUALIZATION AND COMPUTER GRAPHICS, v.19, no.9, pp.1513 - 1525, 2013-09

172673
Scheduling in semiconductor wafer fabrication facilities producing multiple product types with distinct due dates = 주문형 반도체 제조공정에서의 일정계획link

Kim, Hyung-Un; 김형운; et al, 한국과학기술원, 2000

172674
Scheduling in Wireless Networks: Complexity, Tradeoffs, and Impacts

Yi, Yung; Proutiere, Alexandre; Chiang, Mung, INFORMS Optimization Society Conference, 2008

172675
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

172676
Scheduling in-line multiple cluster tools: A decomposition approach

Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho; Kim, Chulhan; Baik, Sun-Hee, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08

172677
Scheduling Instruction-level parallelism

Hye-Kyung Cha, 1994 Joint Tech. Conf. on Circuits/Systems, Computers and Comm., pp.966 - 971, 1994

172678
Scheduling Jobs in a Combined Production-Delivery Supply Chain

성창섭, 한국SCM, 2004

172679
Scheduling jobs with stochastic holding costs

Lee, Dabeen; Vojnovic, Milan, 35th Conference on Neural Information Processing Systems, NeurIPS 2021, pp.19375 - 19384, The Neural Information Processing Systems Foundation, 2021-12-06

172680
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

rss_1.0 rss_2.0 atom_1.0