Scheduling for poly vinyl chloride process operationPoly vinyl chloride 공정 운전에 대한 일정계획

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 515
  • Download : 0
Scheduling problems which contains batch and continuous operations are known as the most difficult industrial scheduling problems. The short-term scheduling problem for manufacturing different grade polymers is addressed in this research. Since the stripping column and the dryers in the polymerization process are operated in a continuous mode and the reactors in a batch mode, the scheduling is a mixed problem of both continuous and batch operation units. The polymerization process is a sequential multipurpose process. In this paper a concept of the mathematical model proposed by Moon and Hrymak (Ind.Eng.Chem.Res., 1999) is used and extended to scheduling the production sequence in each unit. The proposed scheduling model has been applied to a large scale poly vinyl chloride process to verify its efficiency. The monthly scheduling results show the productivity increase by 8~15% compared with the operating data.
Advisors
Park, Sun-Wonresearcher박선원researcher
Description
한국과학기술원 : 생명화학공학과,
Publisher
한국과학기술원
Issue Date
2003
Identifier
180329/325007 / 020013661
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 생명화학공학과, 2003.2, [ vi, 77 p. ]

Keywords

Planning; Scheduling; PVC; 폴리 비닐 클로라이드; 일정계획; 생산계획; Poly Vinyl Chloride

URI
http://hdl.handle.net/10203/29793
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=180329&flag=dissertation
Appears in Collection
CBE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0