175001 | Scheduling of a dual-armed cluster tool with two independent robot arms Tonke, Daniel; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
175002 | Scheduling of a dual-armed cluster tool with two independently working robot arms = 독립적으로 움직이는 두 로봇 팔을 갖는 양팔 클러스터 장비의 스케줄링link Tonke, Daniel; Tonke, H.D.; et al, 한국과학기술원, 2010 |
175003 | Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing Sung, Chang Sup, pp.0 - 0, 1993-04-01 |
175004 | Scheduling of actual size refinery processes considering environmental impacts with multiobjective optimization Song, J; Park, H; Lee, DY; Park, Sunwon, INDUSTRIAL ENGINEERING CHEMISTRY RESEARCH, v.41, no.19, pp.4794 - 4806, 2002-09 |
175005 | Scheduling of arc welding robot considering heat-caused distortion = 열변형을 고려한 아크용접 로봇의 스케줄링link Kim, Hwa-Jung; 김화중; et al, 한국과학기술원, 2002 |
175006 | Scheduling of Batch Manufacturing Process in the Chemical Plants Park, Sunwon, The 14th KACC, KACC, 1999-01-01 |
175007 | Scheduling of Batch Manufacturing Process in The Chemical Plants with An Optimal Control Approach Park, Sunwon, The 12th Symposium on Chemical Engineering, pp.175 - 176, 1999-01-01 |
175008 | Scheduling of Cluster Tools with Complex Scheduling Requirements Yu, Tae Sun; Lee, Tae-Eog, 20th Conference of the International Federation of Operational Research Societies, IFORS, 2014-07-15 |
175009 | Scheduling of cluster tools with independent dual-arm under wafer delay constraints = 체재시간 제약을 가지는 독립된 두 팔 클러스터 장비의 스케줄링link Kwon, Yongmin; Lee, Tae-Eog; et al, 한국과학기술원, 2017 |
175010 | Scheduling of cluster tools with k-periodic chamber cleaning operationslink Lee, Tae-Gyung; Lee, Tae-Eog; et al, 2021 |
175011 | Scheduling of cluster tools with ready time constraints for small lot production Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25 |
175012 | Scheduling of dual independent armed cluster tool with unbalanced workload = 독립적인 두팔을 가진 클러스터 장비의 불균형한 워크로드 스케쥴링link Sheen, Dong Yup; 신동엽; et al, 한국과학기술원, 2015 |
175013 | Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations 이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05 |
175014 | Scheduling of Dual-armed Cluster Tools with k-periodic Chamber Cleaning LEE, TAE GYUNG; Lee, Tae-Eog, 2018 대한산업공학회 추계학술대회, pp.747 - 777, 대한산업공학회, 2018-11-09 |
175015 | Scheduling of Dual-Armed Cluster Tools with Time Constraints Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04 |
175016 | Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04 |
175017 | Scheduling of flexible manufacturing systems employing automated guided vehicles Lee, Doo Yong, International Conference on CAD/CAM Robotics and Factories of the Future, pp.139 - 144, 1993-08 |
175018 | Scheduling of manufacturing systems with reentrant work flows and sequence dependent setup times = 작업 순서에 종속적인 세트업시간 및 재진입 작업 흐름을 갖는 제조시스템의 스케쥴링link Sun, Ji-Ung; 선지웅; et al, 한국과학기술원, 1999 |
175019 | Scheduling of multi-level parts in a flexible manufacturing system = 유연 제조 시스템에서 다단계 부품의 일정 계획에 관한 연구link Kim, Jung-Ug; 김정욱; et al, 한국과학기술원, 1994 |
175020 | Scheduling of multi-slot cluster tools with wafer delay constraintslink Jee, Young-Jun; Lee, Tae-Eog; et al, 2021 |