New MILP models for scheduling of multiproduct batch plants under zero-wait policy

Cited 23 time in webofscience Cited 0 time in scopus
  • Hit : 293
  • Download : 0
DC FieldValueLanguage
dc.contributor.authorMoon, Sungdeukko
dc.contributor.authorPark, Sunwonko
dc.contributor.authorLee, Won Kookko
dc.date.accessioned2013-03-03T03:58:42Z-
dc.date.available2013-03-03T03:58:42Z-
dc.date.created2012-02-06-
dc.date.created2012-02-06-
dc.date.issued1996-10-
dc.identifier.citationINDUSTRIAL ENGINEERING CHEMISTRY RESEARCH, v.35, no.10, pp.3458 - 3469-
dc.identifier.issn0888-5885-
dc.identifier.urihttp://hdl.handle.net/10203/77113-
dc.description.abstractThis paper presents a new mixed-integer linear programming (MILP) model in which makespan is minimized for the multiproduct batch plants. In particular, the zero-wait (ZW) scheduling with transfer and setup times is analyzed. Not only idle times between the successive products but also heads and tails are used to select a possible production sequence with the minimum makespan. To determine the suitable head and tail, new binary variables are defined and aggregated to the assignment constraints of traveling salesman problems (TSPs). Although the number of binary variables increases, the mathematical formulation can yield a very compact MILP model. The effectiveness of the proposed model is demonstrated through several examples. The proposed model is extended to solve the scheduling problems for productions with single product campaigns (SPCs) and mixed product campaigns (MPCs) explained by Birewar and Grossmann (Ind. Eng. Chem. Res. 1989b, 28, 1333). The solutions by the proposed method are compared with the solutions obtained from the rigorous solution method by Birewar and Grossmann, The proposed model is formulated as a compact size and leads to a significant reduction in solution times.-
dc.languageEnglish-
dc.publisherAMER CHEMICAL SOC-
dc.subjectSET-UP TIMES-
dc.subjectCOMPLETION TIMES-
dc.titleNew MILP models for scheduling of multiproduct batch plants under zero-wait policy-
dc.typeArticle-
dc.identifier.wosidA1996VL61200023-
dc.identifier.scopusid2-s2.0-0030257561-
dc.type.rimsART-
dc.citation.volume35-
dc.citation.issue10-
dc.citation.beginningpage3458-
dc.citation.endingpage3469-
dc.citation.publicationnameINDUSTRIAL ENGINEERING CHEMISTRY RESEARCH-
dc.contributor.localauthorPark, Sunwon-
dc.contributor.nonIdAuthorMoon, Sungdeuk-
dc.contributor.nonIdAuthorLee, Won Kook-
dc.type.journalArticleArticle-
dc.subject.keywordPlusSET-UP TIMES-
dc.subject.keywordPlusCOMPLETION TIMES-
Appears in Collection
CBE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 23 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0