Improvability theory for assembly systems: Two component one assembly machine case

Cited 14 time in webofscience Cited 18 time in scopus
  • Hit : 416
  • Download : 0
Improvability theory for a simple assembly system consisting of two components and one assembly machine is developed. Both constrained and unconstrained formulations are addressed. In the constrained case, it is shown that the assembly is unimprovable with respect to workforce if each component machine is blocked as frequently as the assembly machine is starved for parts produced by this particular assembly machine. The system is unimprovable with respect to work-in-process if, roughly speaking, all buffers have equal average steady state occupancy. In the unconstrained improvability case, it is shown that the bottleneck machine can be identified by analyzing the probabilities of the so-called manufacturing blockages and starvations. A generalization to n component-one assembly machine system is also included.
Publisher
GORDON BREACH SCI PUBL LTD
Issue Date
1996
Language
English
Article Type
Article
Citation

MATHEMATICAL PROBLEMS IN ENGINEERING, v.3, no.2, pp.95 - 171

ISSN
1024-123X
DOI
10.1155/S1024123X97000501
URI
http://hdl.handle.net/10203/76487
Appears in Collection
EE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 14 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0