Showing results 1 to 4 of 4
Development of the trenchless rehabilitation process for underground pipes based on RTM Chin, WS; Lee, Dai Gil, COMPOSITE STRUCTURES, v.68, no.3, pp.267 - 283, 2005-05 |
Optimization of a pre-improvement support system for large underground excavation Song, Ki-Il; Cho, Gye-Chun; Sim, Young-Jong; Lee, In-Mo, Tunnelling and Underground Space Technology Journal v. 21 Issue 3-4 pp.374-374, 2006-05 |
Repair of underground buried pipes with resin transfer molding Lee, Dai Gil; Chin, WS; Kwon, JW; Yoo, AK, COMPOSITE STRUCTURES, v.57, no.1-4, pp.67 - 77, 2002-07 |
Trenchless repairing of underground pipes using RTM based on the axiomatic design method Chin, WS; Kwon, JW; Lee, Dai Gil, JOURNAL OF COMPOSITE MATERIALS, v.37, no.12, pp.1109 - 1126, 2003 |
Discover