Showing results 1 to 2 of 2
A Scheduling Algorithm for Workstations with Limited Waiting Time Constraints in a Semiconductor Wafer Fabrication Facility 주병준; 방준영; 김영대, 대한산업공학회지, v.35, no.4, pp.266 - 279, 2009-12 |
Wafer fabrication scheduling subject to resource constraints = 자원제약을 고려한 웨이퍼 제조 스케쥴링link Joo, Byung-Jun; 주병준; et al, 한국과학기술원, 2007 |
Discover