Yu, Xiaoqun; Xiong, Shuping, Engineering Applications of Artificial Intelligence, v.132, 2024-05
Mahmoudinazlou, Sasan; Kwon, Changhyun, COMPUTERS & OPERATIONS RESEARCH, v.162, 2024-02
Choi, Insu; Koh, Woosung; Koo, Bonwoo; Kim, Woo Chang, ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, v.128, 2024-02
Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, v.54, no.1, pp.622 - 633, 2024-01
Wong, Vivian Wen Hui; Kim, Sang Hun; Park, Junyoung; Park, Jinkyoo; Law, Kincho H., JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, v.146, no.1, 2024-01
Kim, Taekyoung; Yu, Xiaoqun; Xiong, Shuping, ERGONOMICS, v.67, no.1, pp.50 - 68, 2024-01
Jung, Jiyoung; Park, Kundo; Cho, Byungjin; Park, Jinkyoo; Ryu, Seunghwa, JOURNAL OF INTELLIGENT MANUFACTURING, v.34, no.8, pp.3623 - 3636, 2023-12
Han, Donghee; Kim, Daehee; Kim, Minsu; Han, Keejun; Yi, Mun Yong, APPLIED INTELLIGENCE, v.53, no.23, pp.29282 - 29299, 2023-12
Li, Binglin; Ahn, Jeongyoun; Yoon, Changwon, JOURNAL OF MACHINE LEARNING RESEARCH, v.24, 2023-12
Lee, Jakyung; Park, Susan; Cho, Mi-hee; Kang, Ji-Won; Kim, Minkyoung; Choi, Suhyeon; Kim, Seok-gyu; Choi, Ji-hee; Han, Keumhee; Kim, Chang-O; Moon, Il-Chul; Choi, Moon; Jang, Soong-nang, BMC HEALTH SERVICES RESEARCH, v.23, no.1, 2023-12
Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions Lim, SK; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.104, no.1, pp.175 - 186, 1998-01 |
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process Kim, Yeong-Dae; Lim, HG; Park, MW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.1, pp.124 - 143, 1996-05 |
Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility Kim, Yeong-Dae; Kim, JU; Lim, SK; Jun, HB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.11, no.1, pp.155 - 164, 1998-02 |
Heuristics for search sequencing under time-dependent probabilities of existence Lee, Ho-Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.34, no.7, pp.2010 - 2024, 2007-07 |
GRAPH-THEORETIC HEURISTICS FOR UNEQUAL-SIZED FACILITY LAYOUT PROBLEMS KIM, JY; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.23, no.4, pp.391 - 401, 1995-08 |
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter Jun, HB; Kim, YD; Suh, Hyo-Won, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.15, no.3, pp.488 - 496, 1999-06 |
Scheduling on parallel identical machines to minimize total tardiness Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02 |
A simulation-based heuristic algorithm for disposition of direction finders Lee, Ho-Joo; Kim, Yeong-Dae; Lee, Sang-Beom, COMPUTERS & INDUSTRIAL ENGINEERING, v.55, no.1, pp.134 - 149, 2008-08 |
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process Duc, Truong Ton Hien; Luong, Huynh Trung; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.187, no.1, pp.243 - 256, 2008-05 |
A backward approach in list scheduling algorithms for multi-machine tardiness problems Kim, Yeong-Dae, COMPUTERS AND OPERATIONS RESEARCH, v.22, no.3, pp.307 - 319, 1995-03 |
Algorithms for determining capacities of individual buffers in assembly/disassembly systems Jeong, KC; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.33, no.3-4, pp.605 - 608, 1997-12 |
A NEW BRANCH AND BOUND ALGORITHM FOR MINIMIZING MEAN TARDINESS IN 2-MACHINE FLOWSHOPS Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.20, no.4, pp.391 - 401, 1993-05 |
A systematic procedure for setting parameters in simulated annealing algorithms Park, MW; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.25, no.3, pp.207 - 217, 1998-03 |
Algorithms for a class of single-machine weighted tardiness and earliness problems Yano, C.A.; Kim, Yeong-Dae, European Journal of Operational Research, v.52, no.2, pp.167 - 178, 1991-05 |
An Iterative Approach to System Setup Problems in Flexible Manufacturing Systems Kim, Yeong-Dae; Yano, CandaceArai, INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, v.4, no.2, pp.183 - 209, 1992-01 |
Token Delays and Generalized Workload Balancing for Timed Event Graphs with Application to Cluster Tool Lee, Tae-Eog; Lee, Hwan-Yong; Sreenivas, Ramavarapu S., Proceeding of the 2006 IEEE Cinference on Automation Science and Engineering, pp.93-99, 2006 |
A tabu search procedure for periodic job shop scheduling Song, JS; Lee, Tae-Eog, COMPUTERS INDUSTRIAL ENGINEERING, v.30, no.3, pp.433 - 447, 1996-07 |
A two-phase approach for design of supervisory controllers for robot cells: Model checking and Markov decision models Lee, Tae-Eog; Lee, JH, ANNALS OF OPERATIONS RESEARCH, v.77, pp.157 - 182, 1998-02 |
Modeling and implementing a real-time scheduler for dual-armed cluster tools Shin, YH; Lee, Tae-Eog; Kim, JH; Lee, HY, COMPUTERS IN INDUSTRY, v.45, no.1, pp.13 - 27, 2001-05 |
The asymptotic value-to-capacity ratio for the multi-class stochastic knapsack problem Lee, Tae-Eog; Oh, GT, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.103, no.3, pp.584 - 594, 1997 |
Discover