Yu, Xiaoqun; Xiong, Shuping, Engineering Applications of Artificial Intelligence, v.132, 2024-05
Mahmoudinazlou, Sasan; Kwon, Changhyun, COMPUTERS & OPERATIONS RESEARCH, v.162, 2024-02
Choi, Insu; Koh, Woosung; Koo, Bonwoo; Kim, Woo Chang, ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, v.128, 2024-02
Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, v.54, no.1, pp.622 - 633, 2024-01
Wong, Vivian Wen Hui; Kim, Sang Hun; Park, Junyoung; Park, Jinkyoo; Law, Kincho H., JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, v.146, no.1, 2024-01
Kim, Taekyoung; Yu, Xiaoqun; Xiong, Shuping, ERGONOMICS, v.67, no.1, pp.50 - 68, 2024-01
Jung, Jiyoung; Park, Kundo; Cho, Byungjin; Park, Jinkyoo; Ryu, Seunghwa, JOURNAL OF INTELLIGENT MANUFACTURING, v.34, no.8, pp.3623 - 3636, 2023-12
Han, Donghee; Kim, Daehee; Kim, Minsu; Han, Keejun; Yi, Mun Yong, APPLIED INTELLIGENCE, v.53, no.23, pp.29282 - 29299, 2023-12
Li, Binglin; Ahn, Jeongyoun; Yoon, Changwon, JOURNAL OF MACHINE LEARNING RESEARCH, v.24, 2023-12
Lee, Jakyung; Park, Susan; Cho, Mi-hee; Kang, Ji-Won; Kim, Minkyoung; Choi, Suhyeon; Kim, Seok-gyu; Choi, Ji-hee; Han, Keumhee; Kim, Chang-O; Moon, Il-Chul; Choi, Moon; Jang, Soong-nang, BMC HEALTH SERVICES RESEARCH, v.23, no.1, 2023-12
Robust design of communication systems: The case of expedited forwarding of voice traffic in differentiated services networks Yoon, Hyoup-Sang; Yum, Bong-Jin, INTERNATIONAL JOURNAL OF COMMUNICATION SYSTEMS, v.20, no.10, pp.1131 - 1154, 2007-10 |
Optimal Design of Step-Stress Degradation Tests in the Case of Destructive Measurement Park, Sang-Jun; Yum, Bong-Jin; S. Balamurali, QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, v.1, no.1, pp.105 - 124, 2004 |
Parallel machine scheduling considering a job-splitting property Kim, Yeong-Dae; Shim, SO; Kim, SB; Choi, Yong-Chan; Yoon, HM, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4531 - 4546, 2004-11 |
Reallocation of paths of ABR services in a multistage interconnection network (MIN)-typeATM switch network Choi, SH; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.159, no.1, pp.207 - 218, 2004-11 |
A linear programming-based algorithm for floorplanning in VLSI design Kim, JG; Kim, Yeong-Dae, IEEE TRANSACTIONS ON COMPUTER-AIDED DESIGN OF INTEGRATED CIRCUITS AND SYSTEMS, v.22, no.5, pp.584 - 592, 2003-05 |
Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility Kim, Yeong-Dae; Shim, SO; Choi, B; Hwang, Hark, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, pp.290 - 298, 2003-05 |
Minimizing makespan on an m-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05 |
Loading algorithms for flexible manufacturing systems with partially groupted machines. Y-D, Kim, IIE Transactions Vol. 32, No. 1, pp. 33-47, Taylor & Francis, 2000 |
Layout planning for facilities with fixed shapes and input and output points Kim, JG; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.38, no.18, pp.4635 - 4653, 2000-12 |
Tool replacement policies for a machining centre producing multiple types of products with distinct due dates Choi, Yong-Chan; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.39, no.5, pp.907 - 921, 2001-03 |
Heuristics for selecting machines and determining buffer capacities in assembly systems Jeong, KC; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.38, no.3, pp.341 - 360, 2000-10 |
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints Park, MW; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.123, no.3, pp.504 - 518, 2000-06 |
A decomposition approach to a multi-period vehicle scheduling problem Kim, JU; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.27, no.4, pp.421 - 430, 1999-08 |
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems Kim, Yeong-Dae; Lee, DH; Yoon, CM, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.133, no.3, pp.624 - 634, 2001-09 |
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12 |
Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10 |
Algorithms for adjusting shapes of departments in block layouts on the grid-based plane Lee, GC; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.28, no.1, pp.111 - 122, 2000-02 |
Development and evaluation of an uncertainty importance measure in fault tree analysis Cho, JG; Yum, Bong-Jin, RELIABILITY ENGINEERING & SYSTEM SAFETY, v.57, pp.143 - 157, 1997 |
Collaborative filtering based on iterative principal component analysis Kim, D; Yum, Bong-Jin, EXPERT SYSTEMS WITH APPLICATIONS, v.28, pp.823 - 830, 2005-05 |
Planning performance degradation tests - A review Yum, Bong-Jin; Lim, H; Seo, SK, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.14, pp.372 - 381, 2007-12 |
Discover