Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 41-50 of 55 (Search time: 0.008 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
41
Schedule Restoration for Single-Armed Cluster Tools

Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08

42
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE

Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12

43
A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint

Lee, Ju Yong; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09

44
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

45
A linear programming based heuristic algorithm for bandwidth packing problem with scheduling

Joung, Seulgi; Lim, Jaeyoong; Lee, Chungmok; Shin, Jongyoon; Jung, Ikkyun; Park, Sungsoo, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.71, no.2, pp.250 - 263, 2020-02

46
Wafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations

Yu, Tae-Sun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.58, no.2, pp.434 - 447, 2020-01

47
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

48
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

49
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

50
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

rss_1.0 rss_2.0 atom_1.0