Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 21-30 of 48 (Search time: 0.008 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
21
A new method for estimating human error probabilities: AHP-SLIM

Park, Kyung Soo; Lee, Jae in, RELIABILITY ENGINEERING & SYSTEM SAFETY, v.93, no.4, pp.578 - 587, 2008

22
A measure of the bullwhip effect in supply chains with stochastic lead time

Duc, TTH; Luong, HT; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.38, pp.1201 - 1212, 2008-10

23
An exact algorithm for a cross-docking supply chain network design problem

Sung, Chang Sup; Yang, W., JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.59, no.1, pp.119 - 136, 2008-01

24
Economic Design of Automated Spiral Parking System

황학, 대한산업공학회지, v.7, no.2, pp.182 - 188, 2008-09

25
Single machine scheduling with outsourcing allowed

Lee, Ik Sun; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.111, no.2, pp.623 - 634, 2008-02

26
A Branch-and-price algorithm for placement routing for a multi-head beam-type component placement tool

Sun, DS; Lee, Tae-Eog, OR SPECTRUM, v.30, no.3, pp.515 - 534, 2008-06

27
Modelling foot height and foot shape-related dimensions

Xiong, Shuping; Goonetilleke, Ravindra S.; Witana, Channa P.; Au, Emily Yim Lee, ERGONOMICS, v.51, no.8, pp.1272 - 1289, 2008

28
Computerized girth determination for custom footwear manufacture

Zhao, J.; Xiong, Shuping; Bu, Y.; Goonetilleke, R. S., COMPUTERS & INDUSTRIAL ENGINEERING, v.54, no.3, pp.359 - 373, 2008-04

29
Machining Tool Path Generation for Point Set

Park, Seyoun; Shin, Hayong, International Journal of CAD/CAM, v.8, no.1, pp.45 - 53, 2008-12

30
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times

Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008

rss_1.0 rss_2.0 atom_1.0