Results 1-10 of 75 (Search time: 0.009 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012 | |
Cyclic Scheduling of Cluster Tools With Nonidentical Chamber Access Times Between Parallel Chambers Kim, Dae-Kyu; Jung, Yu-Ju; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.3, pp.420 - 431, 2012-08 | |
An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems Jung, Chihyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.186 - 199, 2012-05 | |
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07 | |
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes Chien, CF; Dauzere-Peres, S; Ehm, H; Fowler, JW; Jiang, ZB; Krishnaswamy, S; Lee, Tae-Eog; Monch, L; Uzsoy, R, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, no.3, pp.254 - 271, 2011 | |
Scheduling and control of automated manufacturing systems Gunther, HO; Lee, Tae-Eog, OR SPECTRUM, v.29, no.3, pp.373 - 374, 2007-07 | |
Stochastic cyclic flow lines: non-blocking, Markovian models Lee, Tae-Eog; Seo, JW, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.49, no.5, pp.537 - 548, 1998-05 | |
Search-based heuristic algorithms for basic planning in a large shipyard Lee, Tae-Eog; Song J.S; Im J.C; Park JC; Jeong DS; Lee KR, JOURNAL OF SHIP PRODUCTION, v.12, no.4, pp.211 - 219, 1996-11 | |
A three-level supply chain network design model with risk-pooling and lead times Park, Sukun; Lee, Tae-Eog; Sung, Chang Sup, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, v.46, no.5, pp.563 - 581, 2010-09 | |
A Branch-and-price algorithm for placement routing for a multi-head beam-type component placement tool Sun, DS; Lee, Tae-Eog, OR SPECTRUM, v.30, no.3, pp.515 - 534, 2008-06 |
Discover