Results 1-10 of 115 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Heuristics for locating two types of public health-care facilities Kim, Dong-Geun; Kim, Yeong-Dae; Lee, Taesik, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.11, no.2, pp.202 - 214, 2012-06 | |
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 | |
Multiproduct Lot Merging-Splitting Algorithms for Semiconductor Wafer Fabrication Bang, June-Young; Kim, Yeong-Dae; Choi, Seong-Woo, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.200 - 210, 2012-05 | |
Heuristics for determining a patrol path of an unmanned combat vehicle Park, Chul-Hwan; Kim, Yeong-Dae; Jeong, BongJoo, COMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08 | |
Loading algorithms for flexible manufacturing systems with partially grouped machines Lee, DH; Kim, Yeong-Dae, IIE TRANSACTIONS, v.32, no.1, pp.33 - 47, 2000-01 | |
Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09 | |
Fire scheduling for planned artillery attack operations under time-dependent destruction probabilities Cha, YH; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.38, pp.383 - 392, 2010-10 | |
Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines Choi, YC; Kim, Yeong-Dae; Bang, JY, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12 | |
Coordination of inventory and transportation managements in a two-level supply chain Kang, Jae-Hun; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.123, no.1, pp.137 - 145, 2010-01 | |
Inventory replenishment and delivery planning in a two-level supply chain with compound Poisson demands Kang, JH; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.49, pp.1107 - 1118, 2010-08 |
Discover