Results 1-10 of 12 (Search time: 0.006 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Fire scheduling for planned artillery attack operations under time-dependent destruction probabilities Cha, YH; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.38, pp.383 - 392, 2010-10 | |
Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines Choi, YC; Kim, Yeong-Dae; Bang, JY, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12 | |
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09 | |
Scheduling algorithms for a semiconductor probing facility Bang, June-Young; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.38, no.3, pp.666 - 673, 2011-03 | |
Heuristics for Scheduling Wafer Lots at the Deposition Workstation in a Semiconductor Wafer Fab 최성우; 임태규; 김영대, 대한산업공학회지, v.36, no.2, pp.125 - 137, 2010-06 | |
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07 | |
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times An, Young-Jin; Kim, Yeong-Dae; Choi, Seong-Woo, COMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07 | |
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12 | |
Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12 | |
다수 고객 통합전략을 활용하는 생산 및 물류계획 수립 노경완; 성창섭; 이익선, 경영과학, v.31, no.3, pp.13 - 26, 2014-11 |
Discover