Results 1-4 of 4 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines Choi, YC; Kim, Yeong-Dae; Bang, JY, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12 | |
Heuristics for Scheduling Wafer Lots at the Deposition Workstation in a Semiconductor Wafer Fab 최성우; 임태규; 김영대, 대한산업공학회지, v.36, no.2, pp.125 - 137, 2010-06 | |
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07 | |
Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12 |
Discover