Results 21-30 of 32 (Search time: 0.004 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
OPTIMAL BUFFER SPACE FOR A PERIODIC REVIEW PRODUCTION INVENTORY SYSTEM WITH INVENTORY-DEPENDENT PRODUCTION-RATE Sung, Chang Sup; HAN, YH, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.29, no.1, pp.11 - 25, 1993-02 | |
Heuristic Algorithms for a Single-Machine Common Due Date Assignment under Earliness/Tardiness Measure Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.36, no.3, pp.121 - 133, 1993-04 | |
Branch-and-Bound Redundancy-Optimization for a Series System with Multiple-Choice Constraints Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.48, no.2, pp.108 - 117, 1999-06 | |
SETUP COST REDUCTION IN A DYNAMIC LOT-SIZE MODEL WITH MULTIPLE FINITE PRODUCTION-RATES Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.24, no.1, pp.19 - 37, 1995 | |
A Neural Network Approach for Batching Decisions in Wafer Fabrication Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.37, no.13, pp.3101 - 3114, 1999-09 | |
A Scheduling Procedure for a General Class of Resource-Constrained Projects Sung, Chang Sup, COMPUTERS & INDUSTRIAL ENGINEERING, v.32, no.1, pp.9 - 17, 1997-04 | |
A Constrained Single Machine Scheduling Model with Earliness/Tardiness and Flow Time Measures Joo, Un Gi; Sung, Chang Sup, 한국경영과학회지, v.20, no.1, pp.115 - 130, 1995-04 | |
A ROUTING ALGORITHM FOR VIRTUAL CIRCUIT DATA-NETWORKS WITH UNRELIABLE LINKS Sung, Chang Sup; kang bae lee, ENGINEERING OPTIMIZATION, v.24, no.2, pp.119 - 136, 1995 | |
PERFORMANCE MODELING OF AN FMS WITH FINITE INPUT AND OUTPUT BUFFERS Sung, Chang Sup; KWON, ST, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.37, no.2-3, pp.161 - 175, 1994-12 | |
ROLLING SCHEDULES FOR A DYNAMIC LOT-SIZING PROBLEM WITH START-UP COST Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.22, no.2, pp.137 - 152, 1994 |
Discover