Results 1-3 of 3 (Search time: 0.003 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 | |
A Scheduling Algorithm for Workstations with Limited Waiting Time Constraints in a Semiconductor Wafer Fabrication Facility 주병준; 방준영; 김영대, 대한산업공학회지, v.35, no.4, pp.266 - 279, 2009-12 | |
Minimizing total tardiness on a two-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.199, no.2, pp.375 - 384, 2009-12 |
Discover