Results 1-5 of 5 (Search time: 0.005 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 | |
HEURISTIC ALGORITHM FOR A MILITARY TRAINING TIMETABLING PROBLEM Lee, S.Y.; Kim, Yeong-Dae; Lee, H.J., ASIA PACIFIC MANAGEMENT REVIEW, v.14, no.3, pp.289 - 299, 2009-09 | |
Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout Lee, Mi Lim; Kim, Jae-Gon; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.47, no.18, pp.5185 - 5202, 2009 | |
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints Joo, Byung Jun; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.60, pp.572 - 582, 2009-04 | |
Minimizing total tardiness on a two-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.199, no.2, pp.375 - 384, 2009-12 |
Discover