Results 1-4 of 4 (Search time: 0.007 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
An exact algorithm for a cross-docking supply chain network design problem Sung, Chang Sup; Yang, W., JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.59, no.1, pp.119 - 136, 2008-01 | |
Single machine scheduling with outsourcing allowed Lee, Ik Sun; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.111, no.2, pp.623 - 634, 2008-02 | |
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008 | |
Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed Lee, Ik Sun; Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.186, no.3, pp.931 - 952, 2008-05 |
Discover