Search

Start a new search
Current filters:
Add filters:
  • Results/Page
  • Sort items by
  • In order
  • Authors/record

Results 1-10 of 10 (Search time: 0.006 seconds).

NO Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date)
1
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

2
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

3
Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07

4
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

5
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04

6
Non-Cyclic Scheduling of a Wet Station

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.4, pp.1262 - 1274, 2014-10

7
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

8
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04

9
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

10
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

rss_1.0 rss_2.0 atom_1.0