Showing results 1 to 8 of 8
A backward approach in list scheduling algorithms for multi-machine tardiness problems Kim, Yeong-Dae, COMPUTERS AND OPERATIONS RESEARCH, v.22, no.3, pp.307 - 319, 1995-03 |
A heuristic algorithm for a production planning problem in an assembly system Park, MW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.2, pp.138 - 147, 1999-02 |
Co-evolutionary genetic algorithm for multi-machine scheduling: coping with high performance variability Baek, DH; Yoon, Wan Chul, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.40, no.1, pp.239 - 254, 2002-01 |
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01 |
Impact of throughput-based objectives and machine grouping decisions on the short-term performance of flexible manufacturing systems Kim, Yeong-Dae; Yano, CA, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.35, no.12, pp.3303 - 3322, 1997-12 |
Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop Lee, DH; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.34, no.5, pp.1347 - 1360, 1996-05 |
Scheduling algorithms for flexible manufacturing systems with partially grouped machines Lee, DH; Kim, Yeong-Dae, JOURNAL OF MANUFACTURING SYSTEMS, v.18, no.4, pp.301 - 309, 1999 |
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02 |
Discover