IE-Conference Papers(학술회의논문)

Recent Items

Collection's Items (Sorted by Submit Date in Descending order): 1601 to 1620 of 1894

1601
An Integer Program of the Time Slot Assignment Problem in SS/TDMA Systems with Intersatellite Links

이태한; 박성수, 한국경영과학회/대한산업공학회 '97춘계공동학술대회, pp.809 -, 한국경영과학회/대한산업공학회, 1997

1602
A State-of-art of Open Type Automated Communication Technologies

Shin, Y.; Lee, J.; Lee, Tae-Eog; Park, J., 한국경영과학회/대한산업공학회 춘계공동학술대회 , pp.1 - 8, 한국경영과학회/대한산업공학회, 1998-04

1603
Project Management for Distributed Engineering Collaboration

Lee, Tae-Eog; Seo, J.; Kim, J.-H.; Jung, S., CALS/EC Korea'98, pp.375 - 389, 1998-10

1604
A Hierarchical Modeling Technique for Performance Evaluation of PROFIBUS-based Networks

Sun, D.; Lee, Tae-Eog; Lee, J.; Park, J., 제 6회 첨단생산시스템 Workshop, pp.105 - 110, 1998-09

1605
Modeling and Analysis of Stochastic Cyclic Flow Lines with Blocking

Lee, Y.; Lee, Tae-Eog, 대한산업공학회 추계학술대회, pp.1 - 7, 대한산업공학회, 1997-09

1606
An MMS Communication Server for CNCs

Shin, Y.; Seo, J.; Lee, Tae-Eog; Kim, S.; Lee, H., 대한산업공학회 추계학술대회, pp.1 - 5, 대한산업공학회, 1997-09

1607
Design and Implementation Methods of a PROFIBUS-based Network for an FMS

Lee, J.; Lee, J.; Lee, Tae-Eog; Park, J., 대한산업공학회 추계학술대회, pp.1 - 6, 대한산업공학회, 1997-09

1608
A Tow Machine Flow Shop Scheduling Problem with the N-Step-prior-job Dependent Setup Times

Hwang, Hark, The 14th International Conference on Production Research, pp.466 - 469, 1997

1609
Supervisory Controller Design of Robot Assembly Cells by Model Checking Techniques

Lee, Tae-Eog; Lee, Jin-Kyu; Lee, Jin-Whan, The 20th International Conference on Computer and Industrial Engineering, pp.129 - 132, 1996-10

1610
Human Scheduling Performance in a Computer-aided Jobshop Scheduling Task

Paek, D.H.; Oh, S.Y.; Yoon, Wan Chul, 20th International Conference on Computers and Industrial Engineering, pp.753 - 760, 1996-10

1611
Performance Characteristics of Stochastic Cyclic Flow Lines with Blocking

Choi, Oh-Kyu; Lee, Tae-Eog, 한국경영과학회/대한산업공학회 춘계공동학술대회 , pp.1 - 7, 한국경영과학회/대한산업공학회, 1998-04

1612
Perceived Urgency of Synthesized Voice Warning

박경수, 1996 Fall proc. Ergonomics Soc. Kor., pp.191 - 196, 1996

1613
A two machine flow shop scheduling problem with the N-step-prior-job dependent setup times

Hwang, Hark, The 14-th International Conference on Production Research, 1997-01-01

1614
A Neural Network Approach for Batching Decisions in Wafer Fabrication

Sung, Chang Sup, pp.0 - 0, 1997-01-01

1615
A Tabu-Search Based Clustering Algorithm

Sung, Chang Sup, pp.0 - 0, 1996-01-01

1616
A counterexample to a conjecture of Harrison and Wein

Morrison, James R; Kumar, P. R., IEEE conference on Decision and Control, IEEE, 1998-12-16

1617
Guaranteed efficiency in closed reentrant networks

Morrison, James R; Kumar, P. R., IEEE Conference on Decision and Control, IEEE, 1997-12-10

1618
Stability and performance analysis of queueing networks with virtual multiserver stations

Morrison, James R; Kumar, P. R., IEEE Conference on Decision and Control, IEEE, 1997-12-10

1619
Tool placement in the tool magazine of a flexible machine

Hwang, Hark, First International Conference on Engineering Design and Automation, 1997-01-01

1620
Tool Placement in the Tool Magazine of Flexible Machine

Hwang Hark, 96 대한산업공학회 추계학술대회, 1996-01-01

rss_1.0 rss_2.0 atom_1.0