Showing results 1 to 2 of 2
Multi-Period Part Selection and Loading Problems in Flexible Manufacturing Systems Kim, Y-D.; Lee, Dong-Ho; Lim, Seung-Kil; Lee, Geun-Cheol; Jun, Hong-Bae, Computer and Industrial Engineering, vol.33, no.3-4, pp.541-544, 1997 |
Simulated annealing algorithms for locating pickup and delivery points in an automated guided vehicle system Kim, Jae-Gon; Lee, Dong-Ho; Kim, Yeong-Dae, The 1st Korea-Japan Joint Conference on Industrial Engineering and Management, pp.177 - 182, 1998 |
Discover