Minimizing mean flow time on a single batch-processing machine for the burn-in test operation of semiconductor manufacturing반도체 제조 burn-in공정을 위한 배치 공정 설비에서 평균 흐름시간 최소화문제

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 835
  • Download : 0
DC FieldValueLanguage
dc.contributor.advisorSung, Chang-Sup-
dc.contributor.advisor성창섭-
dc.contributor.authorHong, Yang-Pyo-
dc.contributor.author홍양표-
dc.date.accessioned2011-12-14T04:19:16Z-
dc.date.available2011-12-14T04:19:16Z-
dc.date.issued1996-
dc.identifier.urihttp://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=105308&flag=dissertation-
dc.identifier.urihttp://hdl.handle.net/10203/41483-
dc.description학위논문(석사) - 한국과학기술원 : 산업공학과, 1996.2, [ ii, 31 p. ]-
dc.description.abstractThis thesis considers a scheduling problem at a batch processing machine for the burn-in test operation of semiconductor manufacturing where a burn-in oven corresponds to a batch processing machine and the ready and processing times of jobs arriving at burn-in oven are deterministic and known. For the problem, the total flow time measure is considered to construct schedules in batch sequences so that each batch processing time is determined by one of the jobs in the associated batch that has the largest processing time. The objective is total flow times. A dynamic program algorithm is proposed to find the optimal solution (schedule) in a situation where jobs arrive in SPT order. For general situations, a heuristic method is exploited by first arranging weight factors for jobs for job sequencing and then adopting the dynamic program algorithm for batching decisions. Simulation experiment is performed for the efficient evaluation of the heuristic method.eng
dc.languageeng-
dc.publisher한국과학기술원-
dc.subjectBurn-In-
dc.subjectScheduling-
dc.subjectBatch Processing-
dc.subject배치 공정-
dc.subjectBurn-In 공정-
dc.subject일정계획-
dc.titleMinimizing mean flow time on a single batch-processing machine for the burn-in test operation of semiconductor manufacturing-
dc.title.alternative반도체 제조 burn-in공정을 위한 배치 공정 설비에서 평균 흐름시간 최소화문제-
dc.typeThesis(Master)-
dc.identifier.CNRN105308/325007-
dc.description.department한국과학기술원 : 산업공학과, -
dc.identifier.uid000943587-
dc.contributor.localauthorSung, Chang-Sup-
dc.contributor.localauthor성창섭-
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0