(A) heuristic for the part-mix allocation problem in a mixed production system with a flexible manufactureing cell(FMC) and a conventional job shop유연제조 셀(Flexible manufacturing cell)과 개별공정(job shop)으로 구성되는 복합 생산 시스템에서 가공품 할당문제에 관한 연구

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 563
  • Download : 0
DC FieldValueLanguage
dc.contributor.advisorKim, Yeong-Dae-
dc.contributor.advisor김영대-
dc.contributor.authorLee, Dong-Ho-
dc.contributor.author이동호-
dc.date.accessioned2011-12-14T04:18:00Z-
dc.date.available2011-12-14T04:18:00Z-
dc.date.issued1993-
dc.identifier.urihttp://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=68810&flag=dissertation-
dc.identifier.urihttp://hdl.handle.net/10203/41398-
dc.description학위논문(석사) - 한국과학기술원 : 산업공학과, 1993.2, [ [iii], 65 p. ]-
dc.description.abstractThis thesis considers the part-mix allocation problem in a mixed production system composed of a Flexible Manufacturing Cell (FMC) and a job-shop-type conventional cell with the objective of minimizing the makespan. This allocation problem occurs in a number of small-to-medium sized cellular manufacturing systems, where an FMC is introduced as a means of partial automation or capacity expansion. In this Thesis, the mixed system can be regarded as a two-processor parallel system. For the part-mix allocation problem arising from the mixed manufacturing system, we develop a heuristic algorithm to minimize the makespan for a given set of part types and corresponding lot sizes specified by a master production schedule (MPS). To obtain the makespan of the mixed system, we use the priority dispatching procedure in the job-shop-type conventional cell and a part grouping procedure in the FMC, where the part group is a set of part types for simultaneous processing. The proposed heuristic is a combination of the two procedures and considers the division of a batch by the lots in the conventional cell. Computational results show that a better makespan can be obtained by dividing a given batch into several smaller lots when scheduling the production.eng
dc.languageeng-
dc.publisher한국과학기술원-
dc.title(A) heuristic for the part-mix allocation problem in a mixed production system with a flexible manufactureing cell(FMC) and a conventional job shop-
dc.title.alternative유연제조 셀(Flexible manufacturing cell)과 개별공정(job shop)으로 구성되는 복합 생산 시스템에서 가공품 할당문제에 관한 연구-
dc.typeThesis(Master)-
dc.identifier.CNRN68810/325007-
dc.description.department한국과학기술원 : 산업공학과, -
dc.identifier.uid000911413-
dc.contributor.localauthorKim, Yeong-Dae-
dc.contributor.localauthor김영대-
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0