학위논문(박사) - 한국과학기술원 : 산업공학과, 2005.8, [ ix, 115 p. ]
스케줄링; 반도체 제조 장비; 시간 제약; Scheduling; Semiconductor Manufacturing Equipment; 재방문 작업 흐름; Reentrant Job Flows; Time Window Constraints
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.