Scheduling and control of tandem cluster tools직렬 클러스터 장비의 스케줄링 및 제어

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 3
  • Download : 0
DC FieldValueLanguage
dc.contributor.advisor이태억-
dc.contributor.authorKim, Taehyung-
dc.contributor.author김태형-
dc.date.accessioned2024-07-26T19:30:35Z-
dc.date.available2024-07-26T19:30:35Z-
dc.date.issued2023-
dc.identifier.urihttp://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=1046815&flag=dissertationen_US
dc.identifier.urihttp://hdl.handle.net/10203/320865-
dc.description학위논문(박사) - 한국과학기술원 : 산업및시스템공학과, 2023.8,[v, 93 p. :]-
dc.description.abstractThis paper explores scheduling and control strategies for tandem cluster tools. In particular, it focuses on address- ing congestion that occurs within these tools, with an aim to alleviate such congestion in equipment schedules. In our analysis, we first present a mathematical model based on Timed Event Graph(TEG), assuming a 1-cyclic schedule. This model provides insights into the system behavior and aids in identifying potential bottlenecks. For more universal K-cyclic schedules, we introduce an analysis method using a feedback arc. The feedback arc method helps minimize potential system blockings at the intermediate buffer, thereby reducing the wafer delay. The results of our analysis show that our proposed method can effectively reduce congestion compared to ex- isting scheduling methods. Moreover, we demonstrate that this methodology can be applied to various general sequences, highlighting its versatility and applicability across different types of tandem cluster tools. Through these novel approaches, we contribute towards optimizing scheduling and control strategies within the context of semiconductor manufacturing, ultimately aiming to increase operational efficiency and productivity-
dc.languageeng-
dc.publisher한국과학기술원-
dc.subject반도체 제조▼a직렬 클러스터 툴▼a피드백 컨트롤▼a정체-
dc.subjectSemiconductor manufacturing▼aTandem cluster tool▼aFeedback control▼aCongestion-
dc.titleScheduling and control of tandem cluster tools-
dc.title.alternative직렬 클러스터 장비의 스케줄링 및 제어-
dc.typeThesis(Ph.D)-
dc.identifier.CNRN325007-
dc.description.department한국과학기술원 :산업및시스템공학과,-
dc.contributor.alternativeauthorLee, Taeeog-
Appears in Collection
IE-Theses_Ph.D.(박사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0