DC Field | Value | Language |
---|---|---|
dc.contributor.author | Hossen, Muhammed Mufazzal | ko |
dc.contributor.author | Kang, Sunkoo | ko |
dc.contributor.author | Kim, Jonghyun | ko |
dc.date.accessioned | 2024-03-07T07:00:45Z | - |
dc.date.available | 2024-03-07T07:00:45Z | - |
dc.date.created | 2024-03-06 | - |
dc.date.issued | 2015-04 | - |
dc.identifier.citation | NUCLEAR ENGINEERING AND TECHNOLOGY, v.47, no.3, pp.362 - 379 | - |
dc.identifier.issn | 1738-5733 | - |
dc.identifier.uri | http://hdl.handle.net/10203/318460 | - |
dc.description.abstract | In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs. Copyright (C) 2015, Published by Elsevier Korea LLC on behalf of Korean Nuclear Society. | - |
dc.language | English | - |
dc.publisher | KOREAN NUCLEAR SOC | - |
dc.title | CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT | - |
dc.type | Article | - |
dc.identifier.wosid | 000354911500014 | - |
dc.identifier.scopusid | 2-s2.0-84928635564 | - |
dc.type.rims | ART | - |
dc.citation.volume | 47 | - |
dc.citation.issue | 3 | - |
dc.citation.beginningpage | 362 | - |
dc.citation.endingpage | 379 | - |
dc.citation.publicationname | NUCLEAR ENGINEERING AND TECHNOLOGY | - |
dc.identifier.doi | 10.1016/j.net.2014.12.019 | - |
dc.identifier.kciid | ART001983335 | - |
dc.contributor.localauthor | Kim, Jonghyun | - |
dc.contributor.nonIdAuthor | Hossen, Muhammed Mufazzal | - |
dc.contributor.nonIdAuthor | Kang, Sunkoo | - |
dc.description.isOpenAccess | N | - |
dc.type.journalArticle | Article | - |
dc.subject.keywordAuthor | Analytic hierarchy process | - |
dc.subject.keywordAuthor | Frequency of occurrence | - |
dc.subject.keywordAuthor | Nuclear power plant | - |
dc.subject.keywordAuthor | Risk | - |
dc.subject.keywordAuthor | Relative importance index | - |
dc.subject.keywordAuthor | Severity | - |
dc.subject.keywordPlus | ANALYTIC HIERARCHY PROCESS | - |