DC Field | Value | Language |
---|---|---|
dc.contributor.author | Shin, Woojin | ko |
dc.contributor.author | Lee, Sang-Wook | ko |
dc.contributor.author | Park, Sang-Su | ko |
dc.contributor.author | Kim, Hyunjung | ko |
dc.date.accessioned | 2022-01-11T06:52:49Z | - |
dc.date.available | 2022-01-11T06:52:49Z | - |
dc.date.created | 2021-12-17 | - |
dc.date.issued | 2021-10-26 | - |
dc.identifier.citation | The 2021 INFORMS Annual Meeting | - |
dc.identifier.uri | http://hdl.handle.net/10203/291738 | - |
dc.description.abstract | We address an integrated scheduling problem of machines and cranes for a steel making process. Jobs go through three production stages, each of which has multiple machines, and cranes transport jobs between two consecutive stages. There are multiple cranes, and each crane can handle one job at a time. We propose a novel mixed integer programming model for this integrated scheduling problem by considering the crane interference for the first time. We then develop an efficient heuristic algorithm to provide a near optimal solution in a short time. | - |
dc.language | English | - |
dc.publisher | INFORMS | - |
dc.title | Integrated scheduling of machines and cranes for steelmaking-continuous casting production | - |
dc.type | Conference | - |
dc.type.rims | CONF | - |
dc.citation.publicationname | The 2021 INFORMS Annual Meeting | - |
dc.identifier.conferencecountry | US | - |
dc.identifier.conferencelocation | Virtual | - |
dc.contributor.localauthor | Kim, Hyunjung | - |
dc.contributor.nonIdAuthor | Shin, Woojin | - |
dc.contributor.nonIdAuthor | Lee, Sang-Wook | - |
dc.contributor.nonIdAuthor | Park, Sang-Su | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.