2441 | Heuristic algorithms for a multi-period multi-stop transportation planning problem Kim, JU; Kim, Yeong-Dae; Shim, SO, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.53, no.9, pp.1027 - 1037, 2002-09 |
2442 | Heuristic Algorithms for a Single-Machine Common Due Date Assignment under Earliness/Tardiness Measure Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.36, no.3, pp.121 - 133, 1993-04 |
2443 | Heuristic algorithms for a supply chain network design problem in dairy industry = 유가공산업의 공급사슬네트워크 설계를 위한 휴리스틱 알고리듬link Nasir, Jamal Abdul; Nasir, Jamal Abdul; Kim, Yeong-Dae; 김영대; et al, 한국과학기술원, 2013 |
2444 | Heuristic algorithms for a variant of orienteering problem = 용량제약이 있는 다경로 오리엔티어링 문제의 해법에 관한 연구link Park, Keum-Ae; 박금애; et al, 한국과학기술원, 2007 |
2445 | Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit Kim, Bong-Kyun; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.61, no.4, pp.1309 - 1317, 2011-11 |
2446 | Heuristic algorithms for order picking in automated warehousing systems = 자동창고 시스템의 물품 불출을 위한 근사적 해법link Kim, Deok-Soo; 김덕수; Bai, Do-Sun; Hwang, Hark; et al, 한국과학기술원, 1987 |
2447 | Heuristic algorithms to minimize total tardiness in an identical-parallel-machine scheduling problem with flexible maintenance Lee, Ju-Yong; Kim, Yeong-Dae; Jeong, BongJoo, Asia Pacific Industrial Engineering and Management Systems Conference , Philippine Institute of Industrial Engineers, 2013-12-06 |
2448 | Heuristic approach for prePack optimization of product distribution = 제품 배분을 위한 PrePack 휴리스틱 알고리즘 제안link Lee, Juyeong; 이주영; et al, 한국과학기술원, 2015 |
2449 | Heuristic approach for project scheduling problems with resource-duration interactions = 효율이 서로 다른 자원들을 활용한 프로젝트 추진 일정계획 수립link Lim, Soo-Kyoung; 임수경; et al, 한국과학기술원, 1995 |
2450 | HEURISTIC APPROACHES FOR LOADING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS Kim, Yeong-Dae; Yano, CandaceArai, IIE TRANSACTIONS, v.25, no.1, pp.26 - 39, 1993-01 |
2451 | Heuristic for the assort-packing and distribution problem in the fashion apparel industry Sung, Shin Woong; Jang, Young Jae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.56, no.9, pp.3116 - 3133, 2018-06 |
2452 | Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter Jun, HB; Kim, YD; Suh, Hyo-Won, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.15, no.3, pp.488 - 496, 1999-06 |
2453 | Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 |
2454 | HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULINGPROBLEM WITH INCOMPATIBLE JOB FAMILIES Joo, Byung-Jun; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.15.1 - 31.15.7, 2004 |
2455 | Heuristics for determining a patrol path of an unmanned combat vehicle Park, Chul-Hwan; Kim, Yeong-Dae; Jeong, BongJoo, COMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08 |
2456 | HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01 |
2457 | Heuristics for inventory and delivery management of online-retailer = 온라인 상점의 재고 및 배송 관리를 위한 휴리스틱 알고리즘link 여수민; Yeo, Soo-Min; et al, 한국과학기술원, 2008 |
2458 | Heuristics for locating two types of public health-care facilities Kim, Dong-Geun; Kim, Yeong-Dae; Lee, Taesik, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.11, no.2, pp.202 - 214, 2012-06 |
2459 | Heuristics for minimizing makespan on parallel dedicated machines with family setups = 셋업이 있는 병렬 전용 기계 공정에서의 최대 종료 시간을 최소화 하는 스케쥴링 알고리듬 개발link Kim, Kyoung-Yeon; 김경연; et al, 한국과학기술원, 2007 |
2460 | Heuristics for parallel machine scheduling problem with history dependent setup times = 생산 이력 정보에 의한 셋업시간이 발생하는 병력작업 기계에서의 스케쥴링 방법 개발link Lim, Tae-Kyu; 임태규; et al, 한국과학기술원, 2004 |