Showing results 3881 to 3900 of 6101
Scalable Inference for Hybrid Bayesian Hidden Markov Model Using Gaussian Process Emission Jung, Yohan; Park, Jinkyoo, JOURNAL OF COMPUTATIONAL AND GRAPHICAL STATISTICS, v.31, no.3, pp.666 - 683, 2022-07 |
Scaleable neural combinatorial optimization and real world logistics application = 큰 규모의 조합최적화를 푸는 신경망 기법 및 실제 로지스틱 문제에 적용link Son, Jiwoo; 손지우; et al, 한국과학기술원, 2024 |
Scaling Properties of Delay Tolerant Networks with Correlated Motion Patterns Lee, Uichin; Oh, Soon Y.; Kang-Won Lee; Gerla, Mario, ACM MobiCom Workshop on Challenged Networks (Chants 2009), pp.19 - 26, ACM SIGMOBILE, 2009-09-25 |
Scenario Exploration and Implementation for a Network-Based Entertainment Robot Kim, Yo Chan; Kwon, Hyuk Tae; Yoon, Wan Chul; Kim, Jong Cheol, Proceedings of 21st International Symposium of Human Factors in Telecommunication, HFT, 2008-03 |
Scenario tree generation and stochastic programming under heston framework = 헤스톤 모형을 활용한 시나리오 트리 생성 및 추계 계획법link Chung, Gu-Hyuk; Kim, Woo Chang; et al, 한국과학기술원, 2019 |
Scenario-based approach for the ambulance location problem with stochastic call arrivals under a dispatching policy Sung, Inkyung; Lee, Tae-Sik, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.30, no.1-2, pp.153 - 170, 2018-06 |
Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07 |
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net Kim, JH; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.5, no.3, pp.490 - 503, 2008-07 |
Schedule Restoration for Single-Armed Cluster Tools Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08 |
Schedule stabilization and robust timing control for time-constrained cluster tools Kim, J.-H.; Lee, Tae-Eog, 2003 IEEE International Conference on Robotics and Automation, pp.1039 - 1044, IEEE, 2003-09-14 |
ScheduleNet: learning to solve multi-worker scheduling problems using Graph Neural Networks and Reinforcement Learning. = ScheduleNet:심층 그래프 신경망과 강화학습을 활용한 스케줄링 문제 풀이link Bakhtiyarov, Sanzhar; Park, Jinkyoo; et al, 한국과학기술원, 2020 |
Scheduling a multi-chip package assembly line with reentrant processes and unrelated parallel machines Lee, S.-J.; Lee, Tae-Eog, 2008 Winter Simulation Conference, WSC 2008, pp.2286 - 2291, WSC '08, 2008-12-07 |
Scheduling a Reentrant Flexible Flow Line for Multi-Chip Package Assembly = 멀티칩 패키지 조립을 위한 재방문 흐름 공정의 일정계획 방법에 관한 연구link Lee, Sang-Jin; 이상진; et al, 한국과학기술원, 2008 |
Scheduling a Time-Constrained Wet Station with Multiple Job Flows and Multiple Wafer Handling Robots Lee, Hwan-Yong; Lee, Tae-Eog, MASM, pp.1 - 6, 2005-10-01 |
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots Lee, Tae-Eog; Lee, HY; Lee, SJ, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.45, no.3, pp.487 - 507, 2007-02 |
Scheduling a wet station using a branch and bound algorithm Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho, IEEE Conference on Systems, Man, and Cybernetics, IEEE, 2012-10-16 |
Scheduling algorithms for a semiconductor probing facility Bang, June-Young; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.38, no.3, pp.666 - 673, 2011-03 |
Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines Choi, YC; Kim, Yeong-Dae; Bang, JY, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12 |
Scheduling algorithms for an aircraft maintenance system = 항공기 정비체계에 관한 일정계획 연구link Lee, Dong-Hun; 이동훈; et al, 한국과학기술원, 2008 |
Scheduling algorithms for flexible manufacturing systems with partially grouped machines Lee, DH; Kim, Yeong-Dae, JOURNAL OF MANUFACTURING SYSTEMS, v.18, no.4, pp.301 - 309, 1999 |
Discover