Showing results 1 to 4 of 4
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01 |
Heuristics for parallel machine scheduling problem with history dependent setup times = 생산 이력 정보에 의한 셋업시간이 발생하는 병력작업 기계에서의 스케쥴링 방법 개발link Lim, Tae-Kyu; 임태규; et al, 한국과학기술원, 2004 |
MINIMIZING TOTAL TARDINESS IN PERMUTATION FLOWSHOPS Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.85, no.3, pp.541 - 555, 1995-09 |
ROLLING SCHEDULES FOR A DYNAMIC LOT-SIZING PROBLEM WITH START-UP COST Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.22, no.2, pp.137 - 152, 1994 |
Discover