Showing results 1 to 6 of 6
Analysis of Backward Sequence for Single-Armed Cluster Tools With Processing Time Variations Lee, Jun-Ho; Kim, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.4, pp.2167 - 2174, 2020-10 |
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 |
Iterative job splitting algorithms for parallel machine scheduling with job splitting and setup resource constraints Lee, Jun-Ho; Jang, Hoon; Kim, Hyun-Jung, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.72, no.4, pp.780 - 799, 2021-03 |
Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System Kim, Yeong-Dae; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-Kil, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02 |
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04 |
The Impact of Processing Time Variations on Swap Sequence Performance in Dual-Armed Cluster Tools Lee, Jun-Ho; Kim, Hyun-Jung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.20, no.4, pp.2668 - 2677, 2023-10 |
Discover